NEPRA Notice: Reon One (Pvt) Ltd Seeks Concurrence for Hybrid Solar (2.0 MWp) + 2.5 MW Wind Project at Tripack Films, Port Qasim, Karachi
NEPRA Notice · Karachi · Express,
Notice advertisement published in Express on Wednesday, 17 June 2026, listed under Karachi. Issued by NEPRA Notice.
The original image is temporarily unavailable. Use the source link or the details below. Open the full-size clipping Advertisement details
Issuer: National Electric Power Regulatory Authority (NEPRA). Application by Reon One (Private) Limited (ROPL) for grant of concurrence for introduction of a hybrid power generation facility (Solar + Wind + Battery Energy Storage System) at Tripack Films Limited, Northwestern Industrial Zone, Port Qasim, Bin Qasim Town, Karachi.
| Item | Details |
|---|---|
| Applicant | Reon One (Private) Limited (ROPL) |
| Purpose | Grant of concurrence for hybrid power generation facility |
| Type of generation | Hybrid: Solar + Wind + REFLEX Battery Energy Storage System (BESS) |
| Location | Tripack Films Limited, Northwestern Industrial Zone, Port Qasim, Bin Qasim Town, Karachi |
| Installed capacity (Solar) | 2.0 MWp (795 kWp + 1,211 kWp) |
| Installed capacity (Wind) | 1 × 2.5 MW GE wind turbine |
| BESS | Battery Energy Storage System (REFLEX) (BESS) indicated |
| Performance parameters | Solar: 16.73% (specified), Wind: 29% (specified) |
The Authority has registered the application and invites comments from stakeholders, the general public, and interested/affected parties. Comments may be filed with the Registrar within fifteen (15) days of publication of this notice. Copies of the application submitted by ROPL and further details are available on NEPRA's official website.
Contact for filing comments and further information:
Wasim Anwar Bhinder, Registrar NEPRA
NEPRA Tower, G-5/1 (East), Islamabad
Tel: 92065000 Fax: 6200026 Email: [email protected]
Website: www.nepra.org.pk
Published in Express on Wednesday, 17 June 2026. DailyAds.pk indexes newspaper advertisements; the original notice and the issuing organisation remain the source for final terms and eligibility.