DailyAds.pk
Saved

NEPRA Invites Comments on Reon One's 4.5 MW Hybrid Solar–Wind–BESS Project at Port Qasim, Karachi

NEPRA Invites Comments on Reon One's 4.5 MW Hybrid Solar–Wind–BESS Project at Port Qasim, Karachi · Karachi · The News International,

Notice advertisement published in The News International on Wednesday, 17 June 2026, listed under Karachi. Issued by NEPRA Invites Comments on Reon One's 4.5 MW Hybrid Solar–Wind–BESS Project at Port Qasim, Karachi.

Newspaper clipping: NEPRA Invites Comments on Reon One's 4.5 MW Hybrid Solar–Wind–BESS Project at Port Qasim, Karachi, The News International, 17 Jun 2026 Open the full-size clipping
Original clipping · The News International · 17 Jun 2026 · tap to zoom

Advertisement details

The National Electric Power Regulatory Authority (NEPRA) has registered an application from Reon One (Private) Limited (ROPL) requesting grant of concurrence under Section 14B(5) of the NEPRA Act for a hybrid power generation facility at Tripack Films Limited, Northwestern Industrial Zone, Port Qasim, Bin Qasim Town, Karachi.

FieldDetails
ApplicantReon One (Private) Limited (ROPL); incorporated on April 28, 2025; Corporate Unique Identification No. 0292681
Business Office3rd Floor, Dawood Center, M.T. Khan Road, Karachi
Project TypeHybrid Power Generation Facility (Solar + Wind + REFLEX Battery Energy Storage System - BESS)
Project LocationTripack Films Limited, Northwestern Industrial Zone, Port Qasim, Bin Qasim Town, Karachi
Installed CapacitySolar: 2.0 MWp (795 kWp + 1,211 kWp); Wind: 1 × 2.5 MW GE wind turbine; Total capacity ~4.5 MW. BESS: Reflex Battery Energy Storage System (~5.22 MWh)
Performance ParametersSolar efficiency: 16.73%; Wind: 29%
PurposeInstallation of generation facilities on Tripack Films premises to supply the generated electricity to Tripack Films Limited; application for NEPRA concurrence
Comments / SubmissionStakeholders, general public and affected parties may submit comments to the Registrar, NEPRA within 15 days from the date of publication. The application is available on NEPRA's website: www.nepra.org.pk/news.php
Contact for SubmissionsWasim Anwar Bhinder, Registrar NEPRA; NEPRA Tower, G-5/1 (East), Islamabad. Tel: 9206500; Fax: 2600026; Email: [email protected]

Interested parties should send comments to the Registrar within the 15-day comment period specified by NEPRA; the application documentation can be reviewed on NEPRA's official website.

Published in The News International on Wednesday, 17 June 2026. DailyAds.pk indexes newspaper advertisements; the original notice and the issuing organisation remain the source for final terms and eligibility.

Questions about this notice

What is the last date for this notice?
This advertisement prints no last date. Read the clipping and confirm with NEPRA Invites Comments on Reon One's 4.5 MW Hybrid Solar–Wind–BESS Project at Port Qasim, Karachi.
Which newspaper published this notice?
The News International, in the edition of Wednesday, 17 June 2026.
Which city is this notice for?
Karachi — the location listed for this advertisement.
How do I respond to this notice?
Follow the instructions printed in the clipping; the advertiser’s own page is linked from this one. Applications are not submitted through this page.
The News International · 17 Jun 2026
Fit