HAZECO E-Bids: Rehabilitation & Reconstruction of Boundary Walls at 132kV Grid Stations Balakot and Oghi
HAZECO E-Bids · Balakot; Oghi; Abbottabad · Jang,
Tender advertisement published in Jang on Sunday, 2 August 2026, listed under Balakot; Oghi; Abbottabad. Issued by HAZECO E-Bids. The last date printed on the advertisement was Tuesday, 18 August 2026 and has passed.
Similar tenders
All tendersMore tenders
Advertisement details
Issuer: Hazara Electric Supply Company (HAZECO), Abbottabad. Project Director GSC, Hazara Electric Supply Company (HAZECO), 66 kV Grid Station Murree Road, Abbottabad.
Purpose: Invitation for E-Bids (NCB, Single Stage One Envelope) for rehabilitation and reconstruction of tilted and fallen portions of boundary walls at 132kV Grid Stations Balakot and Oghi.
| Tender ID | Description of Work | PEC Category with specialization Code | Estimated Cost (PKR) | Bid Closing Date & Time | Bid Opening Time |
|---|---|---|---|---|---|
| DM (Civil) / HAZECO / NCB No. 01/2026-27 | REHABILITATION WORK & RE-CONSTRUCTION OF TILTED AND FALLEN PORTION OF BOUNDARY WALL AT 132KV GRID STATION BALAKOT | C-6 & Above (CE-10) | 16,767,003.00 | 2026-08-18, 11:00 Hours | 11:30 Hours |
| DM (Civil) / HAZECO / NCB No. 02/2026-27 | REHABILITATION WORK & RE-CONSTRUCTION OF TILTED AND FALLEN PORTION OF BOUNDARY WALL AT 132KV GRID STATION OGHI | C-6 & Above (CE-10) | 14,029,296.00 | 2026-08-18, 12:00 Hours | 12:30 Hours |
Key eligibility & requirements:
- Registration with PPRA including use of ePADS, and the Pakistan Engineering Council (PEC) renewed for the year 2026-27 for the financial categories and codes specified for the above work.
- Minimum five (5) years construction experience in the field of construction as per the required registration category and codes of the Pakistan Engineering Council (PEC).
- Bidder shall be a natural person, private, entity, or government-owned enterprise who is active tax payer with KPRA, Sales Tax, and FBR.
- Not a Joint Venture (JV).
- Completion of at least two similar contracts in the last five years where each contract value is at least Fifty percent (50%) of the estimated cost of the proposed contract.
- Bidders must provide audited financial records for the last three years from a recognized firm registered with Institute of Chartered Accountants of Pakistan (ICAP).
Financial capacity:
- AATO (PKR) @ 70% of the estimated cost for above NCB.
- Financial Resources / Cash flow (PKR) @ 30% of the estimated cost for above NCB.
Bid security & documents:
- 3% Bid Security of the estimated cost in the form of CDR (original + copy) from a scheduled bank in Pakistan in favour of Hazara Electric Supply Company (HAZECO), Abbottabad, to be submitted before bid closing.
- Bidders quoting more than 10% below or above the engineer's estimate must also submit an additional 2% bid security.
- Bids failing to meet requirements will be rejected as non-responsive.
Submission & availability of documents:
- National Competitive Bidding (NCB) will be conducted in accordance with Single Stage One Envelope method through the E-PADS portal (e-bidding).
- Bidding documents and instructions are available on ePADS and at the office of the Project Director (GSC), HAZECO, Abbottabad.
- Prospective bidders shall submit 3% Bid Security in the form of a CDR (original sealed copy) to the office of Hazara Electric Supply Company (HAZECO), Abbottabad before bid closing time.
- All bids must be submitted via e-PADS portal and comply with PPRA/ePADS procedures.
Additional terms & conditions:
- E-bids having partial and incomplete documents shall be rejected.
- Conditional bids shall not be accepted.
Contact & submission location:
- Project Director GSC, Hazara Electric Supply Company (HAZECO), 66 KV Grid Station Murree Road Abbottabad.
- Phone: 0992-930131
- Email: project.director.system.construction@hazeco.com.pk
Advertisement reference: TENDER NO. DM (Civil) / HAZECO / NCB No. 01/02-2026-27 (as printed in the notice).
Published in Jang on Sunday, 2 August 2026. DailyAds.pk indexes newspaper advertisements; the original notice and the issuing organisation remain the source for final terms and eligibility.