NEPRA Notice: Monnoo Energy Limited Proposed Modification to Generation Licence to Add 4.7 MW Solar PV (Islamabad)
NEPRA Notice · Islamabad · Express,
Notice advertisement published in Express on Thursday, 2 July 2026, listed under Islamabad. Issued by NEPRA Notice.
The original image is temporarily unavailable. Use the source link or the details below. Open the full-size clipping Advertisement details
Issuer: National Electric Power Regulatory Authority (NEPRA). Stakeholders, affected persons and the general public are informed that Monnoo Energy Limited (the licensee) has submitted a Licensee Proposed Modification (LPM) to its Generation Licence. The application seeks approval to introduce a solar PV plant alongside the existing heavy fuel oil (HFO) thermal units to optimize generation and reduce reliance on HFO.
| Item | Details |
|---|---|
| Licensee | Monnoo Energy Limited |
| Regulator / Issuer | National Electric Power Regulatory Authority (NEPRA), Islamabad |
| Licence Type / Category | Generation Licence — Proposed Modification (LPM) |
| Proposed Modification | Install a 4.7 MW Solar PV generation facility, increasing total plant capacity up to 12 MW alongside the existing 4.6 MW HFO-based thermal generation facility. |
| Stated Reason / Purpose | Optimize plant capacity factor and reduce fuel dependence and operating costs by supplementing thermal generation with solar PV. |
| Impact on Tariff / Service | Licensee states the proposed modification will not result in an increase in tariff and will not affect licence obligations; it is intended to improve operational efficiency. |
| How to Submit Comments / Objections | All stakeholders and affected persons may view the application and submit comments/objections to NEPRA within fifteen (15) days of this notice via NEPRA’s office or the NEPRA website. |
| Contact / Address / Website | NEPRA Tower, Attaturk Avenue, Sector G-5/1, Islamabad. Visit https://www.nepra.org.pk for related documents and submission instructions. |
Interested parties should follow NEPRA’s published procedure for filing objections or representations and include proof of service as required by the regulator.
Published in Express on Thursday, 2 July 2026. DailyAds.pk indexes newspaper advertisements; the original notice and the issuing organisation remain the source for final terms and eligibility.