DailyAds.pk
Saved

NEPRA Notice — Proposed Modification to Generation Licence of Monnoo Energy Limited

NEPRA Notice · Islamabad · Express,

Notice advertisement published in Express on Thursday, 2 July 2026, listed under Islamabad. Issued by NEPRA Notice.

Newspaper clipping: NEPRA Notice — Proposed Modification to Generation Licence of Monnoo Energy Limited, Express, 02 Jul 2026 Open the full-size clipping
Original clipping · Express · 02 Jul 2026 · tap to zoom

Advertisement details

National Electric Power Regulatory Authority (NEPRA) invites comments on a Licensee Proposed Modification (LPM) to the generation licence of Monnoo Energy Limited (MEL). MEL seeks approval to modify its licence to increase its installed generation capacity by adding a solar photovoltaic (PV) plant alongside its existing heavy fuel oil (HFO) thermal unit.

IssuerNational Electric Power Regulatory Authority (NEPRA)
LicenseeMonnoo Energy Limited (MEL)
Notice TypeLicensee Proposed Modification (LPM) — Generation Licence
Proposed ModificationInstall a 7.4 MW solar PV generation plant alongside the existing 4.6 MW HFO-based thermal generation facility
Current Capacity4.6 MW (HFO thermal)
Proposed Additional Capacity7.4 MW (Solar PV)
Total Proposed CapacityUp to 12 MW
Purpose / ReasonOptimize generation facility, enable sustainable operation and incorporation of renewable energy into supply obligations
How to CommentInterested/stakeholders and the general public are invited to submit written comments to NEPRA as per the notice (see NEPRA contact and web link below)
Contact / SubmissionRegistrar, NEPRA (Wasiam Anwar Bhinder) — NEPRA Tower, Attaturk Avenue (East), G-5/1, Islamabad. See: https://www.nepra.org.pk/news.php

Stakeholders and interested persons should review the full LPM documents and submit comments to NEPRA within the timeline specified in the published notice. The NEPRA website link above provides further details and procedures for submission.

Published in Express on Thursday, 2 July 2026. DailyAds.pk indexes newspaper advertisements; the original notice and the issuing organisation remain the source for final terms and eligibility.

Express · 02 Jul 2026
Fit