NEPRA Notice — Proposed Modification to Generation Licence of Monnoo Energy Limited
NEPRA Notice · Islamabad · Express,
Notice advertisement published in Express on Thursday, 2 July 2026, listed under Islamabad. Issued by NEPRA Notice.
The original image is temporarily unavailable. Use the source link or the details below. Open the full-size clipping Advertisement details
National Electric Power Regulatory Authority (NEPRA) invites comments on a Licensee Proposed Modification (LPM) to the generation licence of Monnoo Energy Limited (MEL). MEL seeks approval to modify its licence to increase its installed generation capacity by adding a solar photovoltaic (PV) plant alongside its existing heavy fuel oil (HFO) thermal unit.
| Issuer | National Electric Power Regulatory Authority (NEPRA) |
|---|---|
| Licensee | Monnoo Energy Limited (MEL) |
| Notice Type | Licensee Proposed Modification (LPM) — Generation Licence |
| Proposed Modification | Install a 7.4 MW solar PV generation plant alongside the existing 4.6 MW HFO-based thermal generation facility |
| Current Capacity | 4.6 MW (HFO thermal) |
| Proposed Additional Capacity | 7.4 MW (Solar PV) |
| Total Proposed Capacity | Up to 12 MW |
| Purpose / Reason | Optimize generation facility, enable sustainable operation and incorporation of renewable energy into supply obligations |
| How to Comment | Interested/stakeholders and the general public are invited to submit written comments to NEPRA as per the notice (see NEPRA contact and web link below) |
| Contact / Submission | Registrar, NEPRA (Wasiam Anwar Bhinder) — NEPRA Tower, Attaturk Avenue (East), G-5/1, Islamabad. See: https://www.nepra.org.pk/news.php |
Stakeholders and interested persons should review the full LPM documents and submit comments to NEPRA within the timeline specified in the published notice. The NEPRA website link above provides further details and procedures for submission.
Published in Express on Thursday, 2 July 2026. DailyAds.pk indexes newspaper advertisements; the original notice and the issuing organisation remain the source for final terms and eligibility.