NHA (Central Zone) Request for E‑Proposals — Design Review & Construction Supervision for Multiple Road/Motorway Packages
NHA (Central Zone) Request for E‑Proposals · Lahore · Dunya,
Tender advertisement published in Dunya on Wednesday, 12 August 2026, listed under Lahore. Issued by NHA (Central Zone) Request for E‑Proposals.
Similar tenders
All tendersMore tenders
Advertisement details
Issuer: Government of Pakistan — Ministry of Communications, National Highway Authority (Central Zone).
Purpose: Invitation for e-proposals from reputable consultant firms (engineering organizations) for Design Review and Construction Supervision of multiple highway/motorway packages. Consultants must hold valid Pakistan Engineering Council (PEC) registration and meet other qualification/registration requirements listed in the e-procurement documents.
Key submission & procurement notes:
- Procurement method: Single Stage — Two Envelope procedure (technical and financial envelopes).
- e-Proposals are to be submitted through NHA e-bidding/e-procurement system. Registration on the federal government procurement portal may be required.
- Consultants must provide PEC registration, tax/FBR status and other documents as specified in the bidding documents.
- Bid documents and instructions are available for download from the NHA e-bidding portal and the NHA website; e-documents are stated to be available free of cost.
Listed consultancy packages (Tentative cost for Design Review & Construction Supervision in million PKR):
| S# | Contract / Scope | Location / KM (as shown) | Tentative Cost (PKR millions) |
|---|---|---|---|
| 1 | Rehabilitation and construction of additional carriageway | Faisalabad – Pindi Bhattian Motorway (M-4), KM 239+000 – 256+000 and KM 256+000 – 274+000 (NBC & SBC) M-4 | 150.00 |
| 2 | Rehabilitation and construction of additional carriageway | Faisalabad – Pindi Bhattian Motorway (M-4), KM 274+000 – 292+000 and KM 292+000 – 307+000 (NBC & SBC) M-4 | 100.00 |
| 3 | Improvement and upgradation of road | Road from Lodhran to Multan — listed KM ranges (as shown) | 25.00 |
| 4 | Construction of missing culvert / local traffic connectivity | At junction of M-1 / M-2 motorway (G.T. Road) — local connectivity works | 50.00 |
| 5 | Approach road and river training works | Layyah — Taunsa Bridge | 100.00 |
How to obtain documents & submit:
- Download bidding documents and e-procurement instructions from the NHA e-bidding portal / NHA website.
- Follow the Single Stage Two Envelope submission procedure and submit proposals electronically as instructed in the bidding documents.
- Consultants should ensure all required registrations and documentary evidence (PEC, tax status, etc.) are included with the proposal.
For further details and to access e-procurement documents, consult the National Highway Authority (Central Zone) e-bidding portal and the official NHA website. Interested firms must refer to the full e-procurement advertisement and bidding documents for exact submission deadlines, contact details and complete eligibility criteria.
Published in Dunya on Wednesday, 12 August 2026. DailyAds.pk indexes newspaper advertisements; the original notice and the issuing organisation remain the source for final terms and eligibility.