
FESCO Faisalabad Invitation for Bids (E‑PADS V2.0) – HT/LT Pole Carriage, Erection & Transformer Works
FESCO Faisalabad Invitation for Bids (E‑PADS V2.0) – HT/LT Pole Carriage, Erection & Transformer Works · Faisalabad · Express,
Tender advertisement published in Express on Saturday, 12 September 2026, listed under Faisalabad, Pakistan. Issued by FESCO Faisalabad Invitation for Bids (E‑PADS V2.0) – HT/LT Pole Carriage, Erection & Transformer Works. The last date printed on the advertisement was Wednesday, 30 September 2026 and has passed.
The original image is temporarily unavailable. Use the source link or the details below. Open the full-size clipping Advertisement details
Faisalabad Electric Supply Company Limited (FESCO) invites bids through E-PADS V2.0 from eligible contractors for multiple civil/electrical packages including carriage and erection of HT/LT PCC spun hollow poles, transformer installations and ancillary HT/LT works for various divisions/circles (Jhang, Sultan Bahoo, Toba Tek Singh, Kamalia, Gojra, etc.). Bidders must be registered on the E-PADS platform and meet Pakistan Engineering Council (PEC) and DISCO/WAPDA/NTDC pre-qualification requirements.
Important procurement details:
- Issuer: Chief Engineer (Operation), FESCO, Faisalabad.
- Submission method: Online via E-PADS V2.0 (registration required).
- PEC requirement: Category C-6 or above with relevant specialization (EE-04 & EE-05 where specified).
- Bid security: 2% of the Tender Amount as Bid Security (call deposit/pay order in favour of Chief Engineer (Operation) FESCO Faisalabad) — as specified in tender documents.
- Bid validity: 120 days from bid opening (unless otherwise stated in tender documents).
- Tender documents, details, and online submission: available on E-PADS portal and PPA website; bidders must be registered on E-PADS to participate.
Submission & opening deadline (all packages): Bids to be submitted online by 12:15 PM on 2026-09-30. Technical/financial opening will start at 12:45 PM on 2026-09-30.
Key participation requirements: Firms pre-qualified/registered with DISCOs / NTDC / WAPDA; valid PEC registration with required category and specialization codes; valid tax registration and up-to-date withholding tax status; contractor to meet other eligibility and experience criteria as specified in tender documents.
| Tender No. | Work (summary) | Tender Amount (PKR Million) | Completion Period |
|---|---|---|---|
| 44/2026 CE (Op) | Carriage & erection of HT/LT PCC spun hollow poles (31, 36 & 45 ft) from designated & non-designated PC Pole plants for HT/LT deposit & emergency works under Jhang-I Division / Jhang Circle | 5.00 | 12 Months |
| 45/2026 CE (Op) | Carriage & erection of HT/LT PCC spun hollow poles (31, 36 & 45 ft) as per PEPCO/WAPDA specifications for HT/LT works under Jhang-I Division / Jhang Circle | 5.00 | 12 Months |
| 46/2026 CE (Op) | Carriage & erection of HT/LT PCC spun hollow poles (31, 36 & 45 ft) for Sultan Bahoo Division / Jhang Circle | 5.00 | 12 Months |
| 47/2026 CE (Op) | Stringing of HT line with ACSR Osprey/Dog/Rabbit conductor & installation of transformers (200/100/50/25/15/10 kVA) including stay rods, foundations & associated works under Jhang-I Division | 2.00 | 12 Months |
| 48/2026 CE (Op) | Stringing of HT line & transformer installations for maintenance and deposit works under Jhang-I / Sultan Bahoo Division | 2.00 | 12 Months |
| 49/2026 CE (Op) | Carriage & erection of HT/LT PCC spun hollow poles and related works under Sultan Bahoo Division | 2.00 | 12 Months |
| 50/2026 CE (Op) | Carriage & erection of HT/LT PCC spun hollow poles for Toba Tek Singh Division / Toba Tek Singh Circle | 3.00 | 12 Months |
| 51/2026 CE (Op) | Carriage & erection of HT/LT PCC spun hollow poles and related works for Kamalia Division under Toba Tek Singh Circle | 3.00 | 12 Months |
| 52/2026 CE (Op) | Carriage & erection of HT/LT PCC spun hollow poles for Gojra Division under Toba Tek Singh Circle | 3.00 | 12 Months |
| 53/2026 CE (Op) | Stringing of HT line & transformer installations (various kVA) for Toba Tek Singh Division maintenance and deposit works | 2.00 | 12 Months |
| 54/2026 CE (Op) | Stringing of HT line & transformer installations for Kamalia Division / Toba Tek Singh Circle | 2.00 | 12 Months |
| 55/2026 CE (Op) | Stringing of HT line & transformer installations for Gojra Division under Toba Tek Singh Circle | 2.00 | 12 Months |
For complete tender documents, exact scope, full eligibility criteria, bid security format, and submission instructions refer to the E-PADS V2.0 portal and the procuring entity’s notices. Contact: Chief Engineer (Operation), FESCO, Faisalabad for any official clarifications.
Published in Express on Saturday, 12 September 2026. DailyAds.pk indexes newspaper advertisements; the original notice and the issuing organisation remain the source for final terms and eligibility.










