FESCO (Faisalabad) Invitation for Bids — Multiple HT/LT Pole, Stringing & Electrification Packages (Tender Nos. 82–100/2026)
FESCO (Faisalabad) Invitation for Bids · Faisalabad · Express,
Tender advertisement published in Express on Saturday, 5 September 2026, listed under Faisalabad. Issued by FESCO (Faisalabad) Invitation for Bids. The last date printed on the advertisement was Thursday, 24 September 2026 and has passed.
Similar tenders
All tendersMore tenders
Advertisement details
Issuer
Faisalabad Electric Supply Company Limited (FESCO) — Project Construction, Faisalabad. Additional Chief Engineer (Project Construction) FESCO, Faisalabad.
Invitation
Invitation for Bids (E-PADS v2.0). The Project Director Construction FESCO Faisalabad invites bids through e-PADS v2.0 from eligible bidders on e-PADS v2.0 for the following tenders.
| Tender No. | Name of Work (summary) | Estimated Cost (Millions PKR) | Completion Period | Eligible Category |
|---|---|---|---|---|
| 82/2026 | Carriage & erection of HT/LT PC spun hollow poles 31 & 36 feet from both Designated & Non‑Designated PC Pole Plants for LT Proposals DOP/ELR works under the jurisdiction of Operation Division FESCO Lalian, Chiniot & Chak Jhumra. | 3.00 | 12 Month | Upto C‑6 with specialization code EE‑04 & EE‑05 |
| 83/2026 | Carriage & erection of HT/LT PC spun hollow poles 31 & 36 feet from both Designated & Non‑Designated PC Pole Plants for LT Proposals DOP/ELR works under the jurisdiction of Operation Division Civil Line, Abdullapur, Shekhupura Road & Jaranwala. | 3.00 | 12 Month | Upto C‑6 with specialization code EE‑04 & EE‑05 |
| 84/2026 | Carriage & erection of HT/LT PC spun hollow poles 31 & 36 feet from both Designated & Non‑Designated PC Pole Plants for LT Proposals DOP/ELR works under the jurisdiction of Operation Division FESCO Ghulam Muhammadabad, Nazimabad & Peoples Colony. | 3.00 | 12 Month | Upto C‑6 with specialization code EE‑04 & EE‑05 |
| 85/2026 | Carriage & erection of HT/LT PC spun hollow poles 31 & 36 feet from both Designated & Non‑Designated PC Pole Plants for LT Proposals DOP/ELR works under the jurisdiction of Operation Division FESCO Allama Iqbal, Samundri & Tandlianwala. | 3.00 | 12 Month | Upto C‑6 with specialization code EE‑04 & EE‑05 |
| 86/2026 | Carriage & erection of HT/LT PC spun hollow poles 31, 36 & 45 feet from both Designated & Non‑Designated PC Pole Plants for HT/LT DOP/ELR, SDGs/AP, Village Electrification & Deposit works under the jurisdiction of District Sargodha. | 5.00 | 12 Month | Upto C‑6 with specialization code EE‑04 & EE‑05 |
| 87/2026 | Carriage & erection of HT/LT PC spun hollow poles 31, 36 & 45 feet from both Designated & Non‑Designated PC Pole Plants for LT/HT DOP/ELR, SDGs/AP, Village Electrification & Deposit works under the jurisdiction of District Khushab (Hilly Area). | 5.00 | 12 Month | Upto C‑6 with specialization code EE‑04 & EE‑05 |
| 88/2026 | Carriage & erection of HT/LT PC spun hollow poles 31, 36 & 45 feet from both Designated & Non‑Designated PC Pole Plants for HT/LT DOP/ELR, SDGs/AP, Village Electrification & Deposit works under the jurisdiction of District Bhakkar. | 3.00 | 12 Month | Upto C‑6 with specialization code EE‑04 & EE‑05 |
| 89/2026 | Carriage & erection of HT/LT PC spun hollow poles 31, 36 & 45 feet from both Designated & Non‑Designated PC Pole Plants for HT/LT DOP/ELR, SDGs/AP, Village Electrification & Deposit works under the jurisdiction of District Jhang. | 3.00 | 12 Month | Upto C‑6 with specialization code EE‑04 & EE‑05 |
| 90/2026 | Stringing of HT/LT line for Village Electrification, SDGs/SAP schemes & Deposit Works under the jurisdiction of District T.T. Singh. | 3.00 | 12 Month | Upto C‑6 with specialization code EE‑04 & EE‑05 |
| 91/2026 | Stringing, reconductoring, shifting of HT lines, relocation, new transformer installation, dismantlement of poles/structures, transformers & HT lines for HT/LP/DP/SDGs/AP & Village Electrification & Deposit works under the jurisdiction of District Sargodha (Plain Area). | 5.00 | 12 Month | Upto C‑6 with specialization code EE‑04 & EE‑05 |
| 92/2026 | Stringing, reconductoring, shifting of HT lines, relocation, new transformer installation, dismantlement of poles/structures, HT/LT lines for HT/LP/DP/SDGs/AP & Village Electrification & Deposit works under the jurisdiction of District Chiniot. | 5.00 | 12 Month | Upto C‑6 with specialization code EE‑04 & EE‑05 |
| 93/2026 | Stringing, reconductoring, shifting of HT lines, relocation, new transformer installation, dismantlement of poles/structures, HT/LT lines for HT/LP/DP/SDGs/AP & Village Electrification & Deposit works under the jurisdiction of District Faisalabad (Rural Area). | 5.00 | 12 Month | Upto C‑6 with specialization code EE‑04 & EE‑05 |
| 94/2026 | Stringing, reconductoring, shifting of HT lines, relocation, new transformer installation, dismantlement of poles/structures, HT/LT lines for HT/LP/DP/SDGs/AP & Village Electrification & Deposit works under the jurisdiction of District Bhakkar. | 5.00 | 12 Month | Upto C‑6 with specialization code EE‑04 & EE‑05 |
| 95/2026 | Stringing, uprooting, shifting of HT/LT line, relocation, new transformer installation, reconstruction & repair of poles/structures & HT/LT line for LT/HT DOP/ELR Works under the jurisdiction of Construction Division FESCO Faisalabad. | 5.00 | 12 Month | Upto C‑6 with specialization code EE‑04 & EE‑05 |
| 96/2026 | Shifting of HT/LT line for DOP/ELR & Deposit Works under the jurisdiction of Construction Division FESCO Sargodha (Plain Area). | 5.00 | 12 Month | Upto C‑6 with specialization code EE‑04 & EE‑05 |
| 97/2026 | Carriage, assembling, excavation, concrete, complete earthing, making of Concrete Foundation and Back Filling of HT/ LT Steel Structure 31, 36, 45 & 58 (feet) under the jurisdiction of Construction Division FESCO Jhang. | 4.00 | 12 Month | Upto C‑6 with specialization code EE‑04 & EE‑05 |
| 98/2026 | Carriage, assembling, excavation, concrete, complete earthing, making of Concrete Foundation and Back Filling of HT/ LT Steel Structure 31, 36, 45 & 58 (feet) under the jurisdiction of Construction Division FESCO Toba Tek Singh. | 4.00 | 12 Month | Upto C‑6 with specialization code EE‑04 & EE‑05 |
| 99/2026 | Carriage, assembling, excavation, concrete, complete earthing, making of Concrete Foundation and Back Filling of HT/ LT Steel Structure 58 (feet) under the jurisdiction of Construction Division FESCO Jhang. | 5.00 | 12 Month | Upto C‑6 with specialization code EE‑04 & EE‑05 |
| 100/2026 | Execution of External Electrification of Sargodha Endave Housing Scheme (Mouza Mitha Ki No.41/NB Sargodha) & Prime View City Housing Scheme Mouza Mitha Ki & Sargodha. | 3.715 | 10 Month | Upto C‑6 with specialization code EE‑04 & EE‑05 |
Time & Date for Closing / Opening
- All tenders: Closing time for submission up to 12:15 PM on 24.09.2026.
- Opening time: 12:45 PM on 24.09.2026.
Submission method
All bids must be submitted online through the e‑PADS v2.0 portal: vendors.epads.gov.pk. Bidding documents are available on e‑PADS v2.0.
Bid security / guarantees and bid validity
- Bid Security/Guarantee: 2% of the bid amount in favour of Project Director Construction FESCO Faisalabad.
- Bid validity period: 120 Days.
Eligibility
- Bidder must have a valid Pakistan Engineering Council (PEC) registration renewed for the year 2026‑27 with the Category / Specialization Code as mentioned in the bidding documents.
- Bidder shall be on the Active Taxpayers List (ATL) and will provide Income Tax Returns for the last financial year.
- Bidders shall be registered/ pre‑qualified with DISCOs / NTDC / WAPDA as required (as per tender documents).
- Other eligibility conditions and requisite documents are as specified in the bidding documents on e‑PADS v2.0.
Other conditions / notes
- Bidders shall submit bids electronically on e‑PADS v2.0. Manual bids shall not be accepted.
- Conditional bids shall not be accepted.
- Tender documents, corrigenda and complete instructions are available on e‑PADS v2.0 and FESCO website.
- Successful bidder shall furnish performance guarantee as per rules and conditions of the contract.
- Procurement shall be carried out in accordance with PPRA Rules‑2004 (as amended).
- FESCO reserves the right to reject any or all bids as per rules.
Contact / Reference
Project Construction FESCO, Faisalabad — Additional Chief Engineer (Project Construction). PID(L)1590/26. FESCO‑41(2026).
Note: All details above are reproduced exactly as printed in the advertisement.
Published in Express on Saturday, 5 September 2026. DailyAds.pk indexes newspaper advertisements; the original notice and the issuing organisation remain the source for final terms and eligibility.