FESCO Invitation for Bids (E‑PADS v2.0) — Multiple HT/LT Line & Pole Packages (Closing 2026-09-24)
FESCO Invitation for Bids (E‑PADS v2.0) · Faisalabad · Express,
Tender advertisement published in Express on Saturday, 5 September 2026, listed under Faisalabad. Issued by FESCO Invitation for Bids (E‑PADS v2.0). The last date printed on the advertisement was Thursday, 24 September 2026 and has passed.
Similar tenders
All tendersMore tenders
Advertisement details
Issuer: Faisalabad Electric Supply Company Limited (FESCO) — Project Construction, Faisalabad. Invitation for Bids through E‑PADS v2.0.
Submission method: Electronic bids only via E‑PADS v2.0 (https://vendors.epads.gov.pk).
Bid security: As specified in the bidding documents (bid security percentage indicated in tender docs).
General eligibility and requirements (summary):
- Contractors registered on E‑PADS v2.0.
- Valid Pakistan Engineering Council (PEC) registration for year 2026-27 with applicable category/specialization codes (many lots require C-6 with specialization EE-04 & EE-05).
- Active Taxpayer (ATL) status and up‑to‑date Income Tax returns.
- Relevant experience and documentary evidence as required in bidding documents.
Tenders (Tender No., Name of Work, BOQ / Tender Amount (Millions PKR), Completion Period, Eligible PEC Category, Time & Date for Closing / Opening):
| Tender No. | Name of Work | BOQ / Tender Amount (Millions) | Completion Period | Eligible PEC Category | Time & Date for Closing / Opening |
|---|---|---|---|---|---|
| 82/2026 | Carriage & erection of HT/LT PC spun hollow poles 31 & 36 feet from both Designated & Non-Designated PC Pole Plants for LT Proposals DOP/ELR works under the jurisdiction of Operation Division FESCO Lalian, Chiniot & Chak Jhumra. | 3.00 | 12 Month | C-6 | Upto 12:15 PM 24.09.2026 / Opening 12:45 PM 24.09.2026 |
| 83/2026 | Carriage & erection of HT/LT PC spun hollow poles 31 & 36 feet from both Designated & Non-Designated PC Pole Plants for LT Proposals DOP/ELR works under the jurisdiction of Operation Division FESCO Jaranwala & Tandlianwala. | 3.00 | 12 Month | C-6 | Upto 12:15 PM 24.09.2026 / Opening 12:45 PM 24.09.2026 |
| 84/2026 | Carriage & erection of HT/LT PC spun hollow poles 31 & 36 feet from both Designated & Non-Designated PC Pole Plants for LT Proposals DOP/ELR works under the jurisdiction of Operation Division FESCO Ghulam Muhammad abad, Nazamabad & Peoples Colony. | 3.00 | 12 Month | C-6 | Upto 12:15 PM 24.09.2026 / Opening 12:45 PM 24.09.2026 |
| 85/2026 | Carriage & erection of HT/LT PC spun hollow poles 31 & 36 feet from both Designated & Non-Designated PC Pole Plants for LT Proposals DOP/ELR works under the jurisdiction of Operation Division FESCO Allama Iqbal, Samundri & Tandlianwala. | 3.00 | 12 Month | C-6 | Upto 12:15 PM 24.09.2026 / Opening 12:45 PM 24.09.2026 |
| 86/2026 | Carriage & erection of HT/LT PC spun hollow poles 31, 36 & 45 feet from both Designated & Non-Designated PC Pole Plants for HT/LT DOP/ELR, SDGs/SAP, Village Electrification & Deposit works under the jurisdiction of Construction Division FESCO Chiniot. | 5.00 | 12 Month | C-6 | Upto 12:15 PM 24.09.2026 / Opening 12:45 PM 24.09.2026 |
| 87/2026 | Carriage & erection of HT/LT PC spun hollow poles 31, 36 & 45 feet from both Designated & Non-Designated PC Pole Plants for HT/LT DOP/ELR, SDGs/SAP, Village Electrification & Deposit works under the jurisdiction of Construction Division FESCO Chiniot (Khushab/Hilly Area). | 5.00 | 12 Month | C-6 | Upto 12:15 PM 24.09.2026 / Opening 12:45 PM 24.09.2026 |
| 88/2026 | Carriage & erection of HT/LT PC spun hollow poles 31, 36 & 45 feet from both Designated & Non-Designated PC Pole Plants for HT/LT DOP/ELR, SDGs/SAP, Village Electrification & Deposit works under the jurisdiction of Construction Division FESCO Sargodha (Hilly Area). | 3.00 | 12 Month | C-6 | Upto 12:15 PM 24.09.2026 / Opening 12:45 PM 24.09.2026 |
| 89/2026 | Stringing of HT/LT Line for Village Electrification, SDGs/SAP schemes & Deposit Works under the jurisdiction of District Sargodha. | 3.00 | 12 Month | C-6 | Upto 12:15 PM 24.09.2026 / Opening 12:45 PM 24.09.2026 |
| 90/2026 | Stringing, Re-conductoring, Shifting of HT Lines, Relocation, New Transformer, Dismantlement of Poles/Structures, Transformers & HT Lines for HT Proposals/Deposit Works under the jurisdiction of Construction Division FESCO Jhang. | 5.00 | 12 Month | C-6 | Upto 12:15 PM 24.09.2026 / Opening 12:45 PM 24.09.2026 |
| 91/2026 | Stringing, Re-conductoring, Shifting of HT Lines, Relocation, New Transformer, Dismantlement of Poles/Structures, Transformers & HT Lines for HT Proposals/Deposit Works under the jurisdiction of Construction Division FESCO Khushab. | 5.00 | 12 Month | C-6 | Upto 12:15 PM 24.09.2026 / Opening 12:45 PM 24.09.2026 |
| 92/2026 | Stringing, Re-conductoring, Shifting of HT Lines, Relocation, New Transformer, Dismantlement of Poles/Structures, Transformers & HT Lines for HT Proposals/Deposit Works under the jurisdiction of Construction Division FESCO South & Central. | 5.00 | 12 Month | C-6 | Upto 12:15 PM 24.09.2026 / Opening 12:45 PM 24.09.2026 |
| 93/2026 | Stringing, Re-conductoring, Shifting of HT Lines, Relocation, New Transformer, Dismantlement of Poles/Structures, Transformers & HT Lines for HT Proposals/Deposit Works under the jurisdiction of Construction Division FESCO Shorkot. | 3.00 | 12 Month | C-6 | Upto 12:15 PM 24.09.2026 / Opening 12:45 PM 24.09.2026 |
| 94/2026 | Stringing, Re-conductoring, Shifting of HT Lines, Relocation, New Transformer, Dismantlement of Poles/Structures, Transformers & HT Lines for HT Proposals/Deposit Works under the jurisdiction of Construction Division FESCO Bhakkar. | 5.00 | 12 Month | C-6 | Upto 12:15 PM 24.09.2026 / Opening 12:45 PM 24.09.2026 |
| 95/2026 | Stringing, Re-conductoring, Shifting of HT Lines, Relocation, New Transformer, Dismantlement of Poles/Structures, Transformers & HT Lines for HT Proposals/Deposit Works under the jurisdiction of Construction Division FESCO Chiniot. | 5.00 | 12 Month | C-6 | Upto 12:15 PM 24.09.2026 / Opening 12:45 PM 24.09.2026 |
| 96/2026 | Carriage, Assembling, Excavation, Erection, Complete Earthing, Making of Concrete Foundations & Back Filling of HT / LT Steel Structures 31, 36 & 45 feet under the jurisdiction of Construction Division FESCO Mianwali. | 4.00 | 12 Month | C-6 | Upto 12:15 PM 24.09.2026 / Opening 12:45 PM 24.09.2026 |
| 97/2026 | Carriage, Assembling, Excavation, Erection, Complete Earthing, Making of Concrete Foundations & Back Filling of HT / LT Steel Structures 31, 36 & 45 feet under the jurisdiction of Construction Division FESCO Sargodha (Hilly Area) & Plain Area. | 5.00 | 12 Month | C-6 | Upto 12:15 PM 24.09.2026 / Opening 12:45 PM 24.09.2026 |
| 98/2026 | Carriage, Assembling, Excavation, Erection, Complete Earthing, Making of Concrete Foundations & Back Filling of HT / LT Steel Structures 31, 36 & 45 feet under the jurisdiction of Construction Division FESCO Jhang. | 5.00 | 12 Month | C-6 | Upto 12:15 PM 24.09.2026 / Opening 12:45 PM 24.09.2026 |
| 99/2026 | Carriage, Assembling, Excavation, Erection, Complete Earthing, Making of Concrete Foundations & Back Filling of HT / LT Steel Structures 31, 36 & 45 feet under the jurisdiction of Construction Division FESCO Jhang. | 5.00 | 12 Month | C-6 | Upto 12:15 PM 24.09.2026 / Opening 12:45 PM 24.09.2026 |
| 100/2026 | Execution of External Electrification of Sargodha Endave Housing Scheme Chak No.41/NB Sargodha & Prime View City Housing Scheme Mouza Mitha Lak Sargodha. | 3.715 | 10 Month | Upto C-6 with specialization code EE-04 & EE-05 | Upto 12:15 PM 24.09.2026 / Opening 12:45 PM 24.09.2026 |
Closing & opening: Deadline for submission: 24.09.2026 (closing times shown against each tender on e‑PADS v2.0). Opening on 24.09.2026 (opening times shown against each tender on e‑PADS v2.0).
How to obtain documents and further information:
- All tender documents, eligibility criteria, detailed BOQs and online submission are available on E‑PADS v2.0 (https://vendors.epads.gov.pk).
- For policy, rules and additional notices consult FESCO website and the e‑PADS portal.
Issuing office / Contact on the advertisement: Additional Chief Engineer, Project Construction FESCO, Faisalabad. PID(L)590/26. FESCO‑41(2026) printed on the advertisement.
Published in Express on Saturday, 5 September 2026. DailyAds.pk indexes newspaper advertisements; the original notice and the issuing organisation remain the source for final terms and eligibility.