· Pakistan’s newspaper advertisement archive
DailyAds.pk
Saved
Tenders Closed 06 Oct 2026

MEPCO Multan Invitation to E-Bids (NCB) — Multiple Supply Tenders Closing 2026-10-06

MEPCO Multan Invitation to E-Bids (NCB) · Multan · The Express Tribune,

Tender advertisement published in The Express Tribune on Sunday, 13 September 2026, listed under Multan. Issued by MEPCO Multan Invitation to E-Bids (NCB). The last date printed on the advertisement was Tuesday, 6 October 2026 and has passed.

Similar tenders

All tenders
Newspaper clipping: MEPCO Multan Invitation to E-Bids (NCB) — Multiple Supply Tenders Closing 2026-10-06, The Express Tribune, 13 Sep 2026 Open the full-size clipping
Original clipping · The Express Tribune · 13 Sep 2026 · tap to zoom

Advertisement details

Issuer: Multan Electric Power Company Limited (MEPCO) — PMU (Multan)

Purpose: Invitation to E-BIDS 2.0 (NCB) for multiple supply tenders. Single-stage, Two-Envelope bidding procedure under PPR 2017. Bidders must register and submit bids electronically on MEPCO E-BIDS 2.0 portal.

Tender No. Description Unit Qty Date & Time of Bid Closing Date & Time of Bid Opening Amount of Bid Security (PKR)
PMU-38/2026-27 SPG Poles without Grounding; Bolts & Templates for SPG pole; Bolts for SPG type poles 03-No. Nuts (20-No. Bolts & 60-Nos. Nuts); Bolts for SPD type poles 03-No. Nuts (20-No. Bolts & 60-Nos. Nuts) No. 11 / 120 / 100 / 80 (various) 06-10-2026 10:00 Hrs 06-10-2026 10:30 Hrs 1,005,400/-
PMU-32/2026-27 Templates for SPA type poles with 24Nos. washer; Templates for SPD type poles with 200-Nos. washer No. 84 / 2 / 1 / 4 (various) 06-10-2026 10:10 Hrs 06-10-2026 10:40 Hrs 327,680/-
PMU-40/2026-27 1xxx Conductor (Line conductor) KM 44 06-10-2026 10:20 Hrs 06-10-2026 10:50 Hrs 7,065,920/-
PMU-41/2026-27 Rail Conductor KM 350 06-10-2026 10:30 Hrs 06-10-2026 11:00 Hrs 11,983,760/-
PMU-42/2026-27 Meters: 3 Phase 4-wire KWH meters (5Amp) cl 0.5 qty 74; 3 Phase 4-wire KWH meters (5Amp) cl 0.5 qty 50 for TL/Line No. 74 / 50 06-10-2026 10:40 Hrs 06-10-2026 11:10 Hrs 11,740/- (example lot)
PMU-42/2026-27 (additional lots) Digital Power Factor Meter for 11KV Switchgear; Clip on meter AC/DC (0-20A); Clip on meter AC/DC (0-1000A); Earthing & current transformers; Clip on meters for measurement of AC Current (50 mAmp-200 Amp) & DC Current (5 mAmp-1000Amp) No. PF meters 24; clip-on (0-20A) 20; clip-on (0-1000A) 10; measurement clip-ons 16 06-10-2026 (see above times) 06-10-2026 (see above times) 3,750/- ; 2,600/- ; 2,500/- ; 4,480/- (examples)

Bid submission: All bids to be submitted online through MEPCO E-BIDS 2.0 platform. Bidders to follow Single-stage, Two-Envelope bidding procedure as per PPR 2017.

Contact / Submission Office: Chief Engineer (Development) PMU MEPCO Multan. Phone: +92-61-9220238; Fax No.: +92-61-9220187; Cell: +92-61-9220187.

Additional notes printed:

  • This Invitation to Bids follows the Annual Procurement Plan of FY 2026-27.
  • The procurements are for the fund covered under the relevant plan during the financial year 2026-27.
  • The bidding will be conducted through E-BIDS 2.0 and the Single Stage, Two Envelope bidding procedure as per PPR-2018/2026-27 is applicable and open to all eligible bidders.
  • Interested bidders must be registered on E-BIDS 2.0 and shall submit bids electronically through the EPADS portal before the bid closing date & time.
  • All bids must be accompanied by a Bid Security in the amount mentioned against each lot in PKR as per tender documents.
  • Prices must be quoted in PKR and remain valid as per tender document requirements.
  • MEPCO reserves the right to accept or reject any or all bids as per rules / PPR.
  • Tender documents, scope, specifications, eligibility, bid submission procedure, performance guarantees and terms & conditions are available on the MEPCO e-bidding portal.

Official signatory: Chief Engineer (Development) PMU MEPCO Multan. Tel: +92-61-9220238 Fax No.: +92-61-9220187