DailyAds.pk
Saved
Tenders Closed 14 Sep 2026

Walton Cantonment Board Lahore — Tender Notice for Annual Repair & Maintenance Works (Multiple Packages)

Walton Cantonment Board Lahore · Lahore · Express,

Tender advertisement published in Express on Saturday, 29 August 2026, listed under Lahore. Issued by Walton Cantonment Board Lahore. The last date printed on the advertisement was Monday, 14 September 2026 and has passed.

Newspaper clipping: Walton Cantonment Board Lahore — Tender Notice for Annual Repair & Maintenance Works (Multiple Packages), Express, 29 Aug 2026 Open the full-size clipping
Original clipping · Express · 29 Aug 2026 · tap to zoom

Advertisement details

Issuer: Walton Cantonment Board / Cantonment Executive Officer, Walton Cantonment, Lahore. Sealed/online tenders are invited on e-PAQS/E-PADs (PPRA portal) for multiple Annual Repair & Maintenance work packages under MES Schedule of Rates (amended up to date).

Eligibility: Contractors must be registered with Pakistan Engineering Council (PEC) in the relevant category for 2026-27 and be an active taxpayer on the Federal Board of Revenue list. Bid security (earnest money) equal to 2% of the estimated cost is required for each package.

Submission & Opening: Bids must be submitted online via the E-PADs/PPRA portal. The cut-off time for online submission is 11:00 hours on the closing date and bids will be opened at 11:30 hours on the same day. Earnest money should be furnished in the form prescribed (Call Deposit/ CDR/ Bank Guarantee) in favour of the Cantonment Board Executive Officer, Walton Cantonment.

Common time limit for all packages: As per work order (individual time limits to be stated in work orders).

Sr. Work (summary) Estimated Cost (Million PKR) Bid Security / Earnest Money (PKR) Project Time Limit
1Annual repair/maintenance — Cantonment Fund Building, C.B. Office & residential units (Wards 1–10)20.00400,000As per work order
2Annual repair/maintenance — Metalled roads & road cuts (selected wards)6.00120,000As per work order
3Annual repair/maintenance — Metalled roads & related works (selected wards)15.00300,000As per work order
4Annual repair/maintenance — Metalled roads (selected wards)11.50230,000As per work order
5Annual repair/maintenance — Metalled roads & road works (selected wards)15.00300,000As per work order
6Annual repair/maintenance — Road/pedestrian works (selected wards)11.50230,000As per work order
7Annual repair/maintenance — Sewerage/drainage pipeline works (selected wards)21.66433,200As per work order
8Annual repair/maintenance — Water supply / GI & MS pipeline works (selected wards)21.66433,200As per work order
9Annual repair/maintenance — Sewerage / pipeline works (selected wards)21.66433,200As per work order
10Annual repair/maintenance — Road & allied works (selected wards)21.66433,200As per work order
11Annual repair/maintenance — Water supply related works (selected wards)21.66433,200As per work order
12Annual repair/maintenance — Water supply / pipeline works (selected wards)30.00600,000As per work order
13Annual repair/maintenance — Sewerage / pipeline works (selected wards)21.66433,200As per work order
14Annual repair/maintenance — Water supply / pipeline works (selected wards)21.66433,200As per work order
15Annual repair/maintenance — Miscellaneous building/works (selected wards)10.00200,000As per work order
16Annual repair/maintenance — Miscellaneous civil works / pipe/bore repair (selected wards)10.00200,000As per work order
17Annual repair/maintenance — Civil & horticulture / public works (selected wards)32.50650,000As per work order
18Annual repair/maintenance — Electrical & external works (selected wards)32.50650,000As per work order

Notes: Detailed scope, PEC category requirements, bidding instructions, and complete terms & conditions are available in the tender documents on the PPRA/E-PADs portal. Contact the Walton Cantonment Board office for clarifications prior to bid submission.

Published in Express on Saturday, 29 August 2026. DailyAds.pk indexes newspaper advertisements; the original notice and the issuing organisation remain the source for final terms and eligibility.

Express · 29 Aug 2026
Fit