Cantonment Board Abbottabad Tender Notice: M&R Works 2026-27 (Building, Roads, Drainage, Water Supply, Public Improvements)
Cantonment Board Abbottabad Tender Notice · Abbottabad · Daily Aaj,
Tender advertisement published in Daily Aaj on Sunday, 4 October 2026, listed under Abbottabad. Issued by Cantonment Board Abbottabad Tender Notice. The last date printed on the advertisement was Monday, 26 October 2026 and has passed.
Similar tenders
All tendersMore tenders
Advertisement details
Cantonment Board Abbottabad invites electronic bids for M&R works for the year 2026-27 under the Single Stage Single Envelope Procedure of Rule 36(a) of PPRA Rules 2004 (as amended up to date). Bids are on the basis of % age above, below or at par based on MES Schedule of Rates 2025. Bids are invited from contractors or firms that hold valid registration with Pakistan Engineering Council (PEC) in the relevant category and are on the Active Taxpayers List of the Federal Board of Revenue.
Annual Maintenance and Repair Works for the Year 2026-27
| Sr. | Name of Works | Amount Cost in Rs. (Million) | Earnest Money @5% of Estimated Cost | PEC Category | Project Time Limit |
|---|---|---|---|---|---|
| 1 | Building Works | 2.0 | 5% | C6 & above | As per work order |
| 2 | Road Works: i. PCC Street / Road; ii. Asphalt Road | 9.0 | 5% | C6 & above | As per work order |
| 3 | Drainage Work | 2.0 | 5% | C6 & above | As per work order |
| 4 | Water Supply Works: i. GI Pipe; ii. PE Pipe | 2.0 | 5% | C6 & above | As per work order |
| 5 | Miscellaneous Public Improvement Works | 40.0 | 5% | C6 & above | As per work order |
General Terms & Conditions
- E-bidding documents are available electronically and can be downloaded from the e-Pak Acquisition and Disposal System (EPADS v2.0) at https://eprocure.gov.pk/. They contain the detailed terms and conditions, method of procurement, bid security, bid validity and opening of bid.
- E-bidding shall be done on above, below or at par based on MES Schedule of Rates 2021 in the BOQ. All bidders are required to have valid registration with Pakistan Engineering Council and a valid NTN.
- All prospective bidders shall upload legible scanned copies of the mandatory documents specified in the bidding documents on EPADS v2.0.
- Manual submission of bids shall not be entertained. Bidders not registered on EPADS v2.0 are required to register at https://vendors.epads.gov.pk/. A registration tutorial is available at http://www.youtube.com/watch?v=MNW6T38v7tc.
- E-bids or tenders prepared in accordance with the instructions in the bidding documents must be submitted through EPADS v2.0 on or before 26/10/2026 at 11:30 AM. Bids shall be opened on the same day at 12:00 PM in the presence of tenderers or their authorized representatives.
- Bids shall remain valid for one hundred eighty (180) days from the date of opening.
- Earnest money or bid security of 5% of the estimated cost must be submitted before the closing date and time. It must be in the form of a call deposit in the name of Cantonment Board Abbottabad, issued by a scheduled bank of Pakistan in accordance with Rule 25 of PPRA Rules 2004 (as amended up to date).
- A grievance redressal committee (GRC) has been constituted in accordance with Rule 48 of the Public Procurement Rules, 2004. The notification is available on EPADS, on the procuring agency's website and on the PPRA website (www.ppra.org.pk).
- Cantonment Board Abbottabad reserves the right to demand an analysis of the quoted rates from the concerned bidder to check their reasonability and workability.
- In case of any technical difficulty in using EPADS, bidders may contact the PPRA Team, Director MIS, Room No. 109, 1st Floor, FBC Building, Sector G-5/2, Islamabad. Contact number: 051-111-137-237.
- Conditional tenders and bids without the required call deposit shall not be entertained.
- The procuring agency reserves the right to seek a detailed rate analysis from bidders to assess the reasonability and workability of the quoted rates.
- Only firms that have renewed their enlistment with PEC for the year 2026-27 in the relevant category will be eligible to apply.
- For M&R works, the contractor shall execute the approved works until the execution of contract and M&R works of the new financial year.
- If the lowest quoted rates are less than 20% below the MES Schedule of Rates 2025, the bidder shall furnish a performance guarantee equal to 10% of the estimated cost of the respective work. The guarantee must be a call deposit (CDR) in favour of the Cantonment Executive Officer, Cantonment Board Abbottabad, issued by any scheduled bank of Pakistan within 07 days of issuance of the letter of acceptance. It shall be released or returned after successful completion of the work. If the bidder fails to provide it within the stipulated time, the 5% earnest money or bid security shall be forfeited and the tender for the respective work will be cancelled or re-invited.
- Contractors or bidders who are blacklisted, in litigation with Cantonment Board Abbottabad, or found indulging in corrupt or fraudulent practices will be considered non-responsive.
- Any item not reflected in the BOQ but required at site shall be paid in accordance with MES Scheduled Rates 2025 or prevailing market rates, with the approval of the procuring entity or competent authority.
- The quoted rates shall remain valid until the completion of work and shall in no case be escalated on any pretext.
- The successful party or firm shall execute a contract agreement with Cantt Board Abbottabad at its own expense. The agreement shall include additional prescribed terms and conditions and shall bind both parties to faithful execution of the contracts.
- Work orders will be issued only to contractors who have entered into an agreement with Cantt Board Abbottabad on acceptance of the offered rates.
- The contractor shall not assign or sublet the contract in any case. A contractor or firm found doing so at any stage shall face cancellation of the contract at its own risk and cost, forfeiture of the 5% earnest money already deposited, and a case for blacklisting placed before the Board.
- All applicable Government taxes shall be deducted from the bill as per rules.
- Cantonment Board Abbottabad shall not supply any kind of material or machinery to the contractors.
- If required, the successful contractor or firm will complete all material and lab tests at its own expense before processing of bills. Tests must be done at the University of Engineering & Technology, Taxila, or the Military College of Engineering (Lab Section), Risalpur Cantt.
- The Cantonment Executive Officer or Cantonment Board reserves the right to accept or reject all tenders prior to approval, as per Rule 33(1) of PPRA Rules 2004 (as amended up to date).
- PPRA Rules will prevail in case of any ambiguity regarding bids or procedure.
- A contractor who has received three notices from this office within a single financial year due to delay in work or poor quality of work shall not be allowed to participate in the bidding process.
Cantonment Executive Officer, Abbottabad Cantonment
PID(P)202/26
Published in Daily Aaj on Sunday, 4 October 2026. DailyAds.pk indexes newspaper advertisements; the original notice and the issuing organisation remain the source for final terms and eligibility.