NEPRA Hearing Notice: Tariff Modification Petition for 7.64 MW Marala Hydropower Project
NEPRA Hearing Notice · Islamabad · The Express Tribune,
Admission advertisement published in The Express Tribune on Friday, 9 October 2026, listed under Islamabad. Issued by NEPRA Hearing Notice.
The original image is temporarily unavailable. Use the source link or the details below. Open the full-size clipping Advertisement details
Issuer: National Electric Power Regulatory Authority (NEPRA). Petitioner: Punjab Power Development Company Limited. Purpose: Admission of a tariff modification petition for the 7.64 MW Marala Hydropower Project and announcement of a public hearing.
Key petition details:
| Project | 7.64 MW Marala Hydropower Project |
|---|---|
| Installed capacity | 7.64 MW |
| Auxiliary consumption | 1% |
| Annual energy (currently) | 49.995 GWh |
| Reference tariff | Years 1–20: Rs 9.1177/kWh; Years 21–30: Rs 5.8358/kWh |
The petitioner has requested the following modifications to the tariff and related terms:
| No. | Requested modification |
|---|---|
| i | Extend generation license (GL) expiry date to align with a 30‑year PPA term. |
| ii | Approve reduction in Annual Energy Benchmark from 49.995 GWh to 34.045 GWh. |
| iii | Allow pass‑through of insurance capped at 0.8% of EPC cost, and pass‑through of applicable income tax, sales tax, excise duty or other duties/levies/charges/surcharges on sale of electricity. |
| iv | Change tariff structure from Take‑or‑Pay to Take‑and‑Pay with must‑run; hydrological risk to remain with Seller; excess generation to be compensated at 10% of tariff. |
| v | Index all fixed and variable O&M components annually with respect to NCPI only, irrespective of foreign or local origin. |
| vi | Discontinue upward USD indexation of RoE/RoEDC from 01 Jan 2026 and fix exchange rate at PKR 280.55/USD; any PKR appreciation to be passed on annually. |
| vii | Reduce operational insurance cap from 1.35% to 0.8% of EPC cost, or actual cost, whichever is lower. |
| viii | Exclude 7.5% dividend withholding tax as a pass‑through item. |
| ix | Exclude Water Use Charge payable to Government of Punjab from the tariff from the Effective Date. |
Public hearing details:
| Date & Time | 20 October 2026 (Tuesday), 2:00 PM |
|---|---|
| Venue | NEPRA Tower, Ataturk Avenue (East), G‑5/1, Islamabad |
| Online | Zoom: https://us02web.zoom.us/j/81977346182 (Meeting ID: 819 7734 6182) |
Participation and filings: Any interested person who desires to participate may file an intervention request within seven (7) days from the date of publication of this notice. Intervention requests must state the name and address of the filer, objections, how the person is substantially or specifically affected, the relief sought, and supporting evidence if any. Comments may also be filed within seven (7) days of publication; the Authority may permit participation and consider comments in its final determination.
Contact and downloads: Registrar NEPRA — Wasim Anwar Bhinder. NEPRA Tower, Ataturk Avenue (East) G‑5/1, Islamabad. Phone: 051‑2013200. Fax: 051‑2600021. E‑mail: [email protected]. List of issues and a copy of the petition may be downloaded from NEPRA's website at www.nepra.org.pk.
Published in The Express Tribune on Friday, 9 October 2026. DailyAds.pk indexes newspaper advertisements; the original notice and the issuing organisation remain the source for final terms and eligibility.