Tender Notice — Emergent Road & Bridge Works, C&W Division Upper Chitral (E-PAD Single Stage)
Upper Chitral · Daily Mashriq,
Tender advertisement published in Daily Mashriq on Thursday, 16 July 2026, listed under Upper Chitral. The last date printed on the advertisement was Thursday, 30 July 2026 and has passed.
Similar tenders
All tendersMore tenders
Advertisement details
Issuer: Executive Engineer, C&W Division Upper Chitral, Government of Khyber Pakhtunkhwa.
Purpose: Notice Inviting Tender (E-PAD System - Single Stage Single Envelope) for AOM&R/Emergent nature of work to all Government roads/bridges in District Chitral Upper for the year 2026-27.
Bids to be submitted online through the E-PAD system in accordance with KPPRA Procurement Rules 2014, amended up to 10.05.2022 on Single Stage Single Envelope procedure.
| S. No / Sub-Work Name | Subdivision / Location | Required Category / Security i/c Stamp Duty | Tender Fee @ 0.03% | Period of Completion | Last Date & Time of Submission of E-Bids | Date & Time of Opening of Financial Bid |
|---|---|---|---|---|---|---|
| SH-1: Emergent nature work to all Govt. roads/bridges in sub Division Booni-I (Booni and Mastuj) | Subdivision Booni-I (Booni, Mastuj) | Category: C-6; Rs. 440,000/- | Rs. 6,000/- | As per Work Order | 30/07/2026 12:00 PM | 30/07/2026 12:30 PM |
| SH-2: Emergent nature work to all Govt. roads/bridges in sub Division Booni-II (Torkhow, Mulkhow) | Subdivision Booni-II (Torkhow, Mulkhow) | Category: C-6; Rs. 440,000/- | Rs. 6,000/- | As per Work Order | 30/07/2026 12:00 PM | 30/07/2026 12:30 PM |
Key Terms and Conditions / Instructions to Bidders:
- Tender solicitation documents and instructions to bidders can be obtained from the office of the Executive Engineer C&W Division Upper Chitral on any working day or downloaded from the C&W website (www.cwd.gkp.pk) before the submission date/time.
- Bidders shall submit their E-bids as per KPPRA Notification No. SOR (14)/ Vol:1-20/2021-22 dated 10.05.2022 and Notification No. S.R.O.(15)/Vol:1-25/2022-23 dated 22.08.2022.
- Bid Security in shape of CDR i.e. Bank Name, CDR Number, CDR Amount and Date(s) must be submitted electronically along with E-Bid on the E-PAD System and original CDR must reach the office of Executive Engineer, C&W Division Upper Chitral before the closing date and time.
- All bidders are required to be registered with Khyber Pakhtunkhwa Revenue Authority under Finance Act, 2013 Act No. XXI of 2013.
- Venue of bid opening is office of the Executive Engineer C&W Division Upper Chitral.
- Bidders are required to quote their rates above or below on both MRS as well as on non-MRS items.
- Contractors quoting their bids up to a limit of 10% below Engineer's estimate shall submit bid security equal to 2% of Engineer's estimate. Contractors quoting more than 10% below Engineer's estimate shall submit along with the bid 8% additional security of Engineer's estimate in addition to 2% bid security; if additional security is not accompanied the bid will be considered non-responsive and 2% bid security will be forfeited in favor of Government and the 2nd lowest bidder shall be considered accordingly.
- In case of non-responsive or not convincing rate analysis submitted with bids, the procuring entity may declare such bids non-responsive without any forfeiture of bid securities and record reason thereof.
- Successful bidder shall sign the agreement with the department within 07 days after issuance of Work Order.
- Call deposit of scheduled banks shall be acceptable.
- Electronic bids will be displayed by the Online E-PAD System after 30 minutes of closing time in the presence of bidders/their representatives who choose to be present.
- All other terms, conditions and rules as per relevant procurement rules, KPPRA and the tender documents will apply.
Reference: INF(P)3536/26
Zero Tolerance to Corruption
Contact / Office: Executive Engineer, C&W Division Upper Chitral.
Published in Daily Mashriq on Thursday, 16 July 2026. DailyAds.pk indexes newspaper advertisements; the original notice and the issuing organisation remain the source for final terms and eligibility.