RFP: PMC for Khyber Pakhtunkhwa Solarization of Houses Initiative Phase-1 (100% Subsidized) — PEDO
RFP · Peshawar · Daily Mashriq,
Tender advertisement published in Daily Mashriq on Sunday, 13 September 2026, listed under Peshawar. The last date printed on the advertisement was Wednesday, 30 September 2026 and has passed.
The original image is temporarily unavailable. Use the source link or the details below. Open the full-size clipping Advertisement details
Issuer: Pakhtunkhwa Energy Development Organization (PEDO). Purpose: Procurement of a Project Management Consultant (PMC) for the project "Khyber Pakhtunkhwa Solarization of Houses Initiative, Phase-1 (100% Subsidized)" under Single Stage Two Envelope procedure — Quality and Cost Based Selection (QCBS) as per clause 23(b) of KPPRA Rules-2014.
Key details:
| Bid Reference | PEDO/SOLAR/KP HOUSES/01 |
|---|---|
| Issue Date | 2026-09-08 |
| Submission Portal | E-PAK Acquisition and Disposal System (EPADS) |
| Submission Deadline | 2026-09-30 by 14:00 Hrs |
| Technical Proposal Opening | 2026-09-30 at 14:30 Hrs (in presence of authorized representatives) |
| Pre-proposal Conference | 2026-09-17 at 11:00 Hrs — Main Committee Room, PEDO House, Sector 38/B-2, Phase-V, Hayatabad, Peshawar |
Mandatory eligibility and registration:
| PEC Registration Codes | 1210 — Renewable Energy Sources and Systems; 1235 — Surveying, Evaluation and Loss Assessment |
|---|---|
| Service Codes Required | 0537 (Engineering Design), 0542 (Design Review), 0545 (Procurement Services), 0547 (Supervision/Inspection of Equipment Installation) |
| Tax Registration | Registered with Khyber Pakhtunkhwa Revenue Authority (KPRA) and Federal Board of Revenue (FBR) |
Submission and selection notes:
- Proposals (technical and financial) must be submitted only via EPADS; hard-copy submissions are not allowed.
- Selection will follow the QCBS procedure. The Procuring Entity reserves the right to reject any or all bids and will communicate grounds for rejection upon request as per rule 47(1) of KPPRA Rules-2014.
Contact / Address for obtaining information:
Project Director (Solar), House #13 C/C, Shaheed Sifwat Ghayoor Road, University Town, Peshawar.
Assistant Manager (Procurement & Contracts), Solar Energy, PEDO Peshawar.
Published in Daily Mashriq on Sunday, 13 September 2026. DailyAds.pk indexes newspaper advertisements; the original notice and the issuing organisation remain the source for final terms and eligibility.