HESCO Tender: Design, Supply & Commissioning of 132 kV GIS Substation and 132 kV Transmission Line at River Bund (RFB PK-HESCO-NEW (GIS) RIVERBUND GS & NEW T/LINE-NCB/06)
HESCO Tender · Hyderabad · Dunya,
Tender advertisement published in Dunya on Tuesday, 30 June 2026, listed under Hyderabad, Pakistan. Issued by HESCO Tender. The last date printed on the advertisement was Tuesday, 7 July 2026 and has passed.
The original image is temporarily unavailable. Use the source link or the details below. Open the full-size clipping Advertisement details
Hyderabad Electric Supply Company (HESCO) invites sealed bids for the design, supply, installation, testing and commissioning of a new 132 kV GIS (Gas-Insulated Substation) grid station with one (01) 40 MVA power transformer, including the associated 132 kV feeding transmission line at River Bund.
| Issuer | Hyderabad Electric Supply Company (HESCO) — Chief Engineer (Development) PMU |
|---|---|
| RFB No. | PK-HESCO-NEW (GIS) RIVERBUND GS & NEW T/LINE-NCB/06 |
| Scope | Design, supply, installation, testing & commissioning of new 132 kV GIS substation with 1x40 MVA transformer and associated 132 kV transmission line at River Bund |
| Bid submission deadline | 2026-07-07, 12:00 p.m. |
| Bid opening | 2026-07-07, 12:00 p.m. |
| Bid validity | 120 days |
| Submission method | Sealed hard-copy bids only — bidders shall not have the option to submit bids electronically |
| Bid bond / Guarantee | An unconditional bank guarantee is required; guarantees from non-banking financial institutions (insurance, bonding or surety companies) are not acceptable. If issued by a foreign bank, the issuing bank must have a correspondent bank in Pakistan to make the guarantee enforceable. |
| Contact / Address for bid submission | Chief Engineer (Development) PMU, HESCO Office, Bungalow # A-1, HESCO Power Colony, Hussainabad, Hyderabad. Tel: +92-22-9260070 |
| Additional reference | PID(H) 452/2025 (procurement notice) |
Prospective bidders should obtain the bidding documents and follow the instructions provided by HESCO. Ensure compliance with bid security and document requirements as stated in the procurement documents.