Issuer: Government of Khyber Pakhtunkhwa, C&W Building Division Haripur (Executive Engineer)
Notice: Notice inviting tender on E-PAD system (Single Stage Single Envelope E-PAD System). C&W Building Division Haripur Govt. of Khyber Pakhtunkhwa invites tenders through E-PAD system from the eligible firms / Contractor in accordance with KPPRA procurement rules 2014 on single stage single envelope procedure for the following works under ADP No. 200131.
| ADP No. | Name of Work | Required PEC category of PEC | E/Cost | 2% Bid Security | Tender Fee (Rs.) | Period of completion | Last date of submission of Bid and time | Date of opening of Bid |
|---|---|---|---|---|---|---|---|---|
| 200131 | Reconstruction of 300 Govt Schools (100 Primary, 100 Middle & 100 High) (B&G) on basis in Khyber Pakhtunkhwa SH: GGPS Sikandarpur (Risk & Cost of original contractor) | C-6 | 11.090 | 221800 | 3327 | As per work order | 09.07.2026 AT 12:00 PM | 09.07.2026 |
| 200131 | Reconstruction of 300 Govt Schools (100 Primary, 100 Middle & 100 High) (B&G) on basis in Khyber Pakhtunkhwa SH: GGMS Pathan Colony (Risk & Cost of original contractor) | C-6 | 7.300 | 146000 | 2190 | As per work order | 09.07.2026 AT 12:00 PM | 09.07.2026 |
Instructions to Bidders:
- Bidding through E-PAD system Single Stage Single Envelope E-PAD System.
- Contractors quoting their bids up to a limit of 10% below Engineer estimate shall submit bid security @ 2% only of Engineer Estimate.
- Contractors quoting their bids more than 10% below up to 20% below on Engineer's Estimate shall submit along with their bids 8% Additional Security of Engineer's Estimated cost in addition to 2% bid security. If the bid is not accompanied with the required amount of additional security then it will be considered as non-responsive and the 2% bid security shall be forfeited in favour of Government and the bidder shall be blacklisted.
- Similarly, a contractor quoting bid more than 20% below shall submit with his bid an additional security on Engineer's Estimated cost equal to differential amount of submitted bid and Engineer's Estimated amount with detailed rate analysis. In case of more than 20% below bids, if the bid is not accompanied by the detailed rate analysis and / or required amount of additional security, the bid shall be considered as non-responsive. All the securities submitted along with such non-responsive bid shall be forfeited in favour of Government and the lowest bidder shall be considered accordingly.
- In case detailed rate analysis is submitted with the bids, in view of the Procuring Entity, not convincing, the Head of the Procuring Entity may declare such bid as non responsive without any forfeiture of bid securities and record reasons thereof.
- The procuring entity may offer the contract to next lowest bidder after due diligence in the context of recoverable difference between such two bids or may advertise procurement opportunity afresh.
- After commencement of work by the successful bidder, the procuring entity may replace the Additional Security with a bank guarantee of the same amount from the scheduled bank; if the additional security is not in the form of bank guarantee.
- The Additional Security shall be released to the contractor in four installments i.e. 1st installment of 25% to be released upon completion of 25% of the project, 2nd installment of 25% to be released upon completion of 50% of the project, 3rd installment of 25% to be released upon completion of 75% of the project and the 4th installment of 25% to be released after 100% completion of the project.
- All bidding will be conducted through the E-PAD system. The financial bid should be submitted by the own self or his authorised representative before the specified closing date and time. No CDRs will be considered after the deadline.
- All bidders must be submit their valid enlistment of C&W Department/ PEC updated at the time of submission of bid.
- All the bidders must deposit tender forms free Rs. 0.03% on E/Cost by each participating contractor online along-with earnest money.
- Electronic bidding shall be done on 'Above / Below' system on BOQ / Engineer's estimate, based on the MRS applicable. Only two digits after decimal point shall be considered for evaluation purpose.
- Any bidder who provides incorrect information shall stand disqualified and shall be debarred.
- Bid validity period 90 days.
- Call Deposit of Scheduled Banks shall be acceptable.
- Electronic bid will be displayed by Online E-PAD System after 30 minutes of closing time in the presence of bidders / their representatives who may like to attend.
- Bid security shall be submitted as specified in the tender documents.
- All bidders are required to be registered with Khyber Pakhtunkhwa Revenue Authority establishment under the Khyber Pakhtunkhwa Finance Act, 2013 otherwise they will not be entitled to participate in tendering process.
- As per KPPRA Notification No. SRO(29)/Vol.1-40/2025-2699-711 dated 29.10.2025 in case of failure to submit the original bid security & additional security instrument before the date and time, the procuring entity shall declare the bidder blacklisted for a period of one (01) year. In case the violator of second time, blacklist him for a minimum period of three (03) years in accordance with Section 29 of the KPPRA Act read with Rule 44 of the Khyber Pakhtunkhwa Public Procurement of Goods, Works & Services Rules, 2014.
Location / District: Haripur, Khyber Pakhtunkhwa.
Advertisement reference: INF(P) 3133/26