Issuer: National Electric Power Regulatory Authority (NEPRA)
| Notice type | Licence Proposed Modification (LPM) in the Generation Licence of K-Electric Limited (KE) |
|---|---|
| Generation Licence | Generation Licence No. GL/04/2002 |
| Licence holder / Plant | K-Electric Limited (KE) — BQPS-III (Bin Qasim Power Station Unit III) |
| Purpose | KE has communicated an LPM in its Generation Licence No. GL/04/2002 under Regulation 10 of the NEPRA Licensing (Application, Modification, Extension and Cancellation) Procedure Regulations, 2021, seeking NEPRA's approval to add indigenous natural gas as a primary fuel for BQPS-III and to include Sui Southern Gas Company (SSGC) as a gas fuel supplier in the Generation Licence, allowing operation on indigenous gas in addition to existing RLNG/HSD arrangements. |
| Brief of LPM / Proposed modification |
|
| Statement of reasons / benefits | KE states that the Gas Turbines of BQPS III are presently connected and commissioned on the RLNG supply system, with RLNG supplied by PLL as the primary fuel and HSD as alternate fuel under the Generation Licence. Based on positive discussions with Sui Southern Gas Company Limited (SSGC) and the Ministry of Energy (Petroleum) regarding the availability of indigenous gas, KE has initiated a project to enable BQPS III to operate on indigenous gas supplied by SSGC. This will lower the cost of fuel, reduce dependency on imported fuel, and enhance operational flexibility including during the event RLNG is unavailable under force majeure conditions. KE intends to file a tariff modification to make the project cost to be part of Plant's Regulatory Asset Base along with change in efficiency and/or capacity due to compressors. |
| Impact on service | KE states the addition of indigenous gas is expected to reduce fuel costs and improve supply reliability through an alternate fuel source, enabling better compliance with licence obligations. |
| Inspection / Documents | The LPM submitted by K-Electric and accompanying documents are available for inspection on NEPRA's website: http://www.nepra.org.pk/neprs.php. |
| How to respond | All stakeholders, interested / affected persons and the general public may submit comments / representations. Responses must be filed within fourteen (14) days from the date of publication of this notice. |
| Contact / Submission | Registrar, NEPRA — Wasim Anwar Bhinder. NEPRA Tower, Ataturk Avenue (East) G-5/1, Islamabad. Tel: 9206500. Fax: 2600072. E-mail: registrar@nepra.org.pk. |
| Disclaimer | Submission / consideration of LPM and its documents for consideration by NEPRA shall not be construed as approval by NEPRA. |
Published in Express on Friday, 18 September 2026. DailyAds.pk indexes newspaper advertisements; the original notice and the issuing organisation remain the source for final terms and eligibility.