C&W Highway Division D.I. Khan Tender: Rehabilitation & Construction of BTR Roads (Multiple Packages)
C&W Highway Division D.I. Khan Tender · Dera Ismail Khan · The News International,
Tender advertisement published in The News International on Saturday, 5 September 2026, listed under Dera Ismail Khan. Issued by C&W Highway Division D.I. Khan Tender. The last date printed on the advertisement was Tuesday, 22 September 2026 and has passed.
Similar tenders
All tendersMore tenders
Advertisement details
Issuer: Executive Engineer, C&W Highway Division, Dera Ismail Khan.
Purpose: Invitation of e-bids for multiple rehabilitation, widening and construction packages of BTR (Blind Top Road) links and village roads under separate packages (Package-C, Package-D, Package-E).
Procurement method and documents:
- e-Bids to be submitted on E-PADS System.
- Bid solicitation documents and instructions to bidders can be obtained from the office of the undersigned or on E-PADS System on any working day before the submission date/time.
- Bidders should submit e-bids as per KPPRA Notification No. SOR (14) / Vol: 1-24 / 2021-22/5068-71, dated 10-05-2022.
- All bidders are required to be registered with Khyber Pakhtunkhwa Revenue Authority under Finance Act, 2013 No XXI of 2013.
Mandatory / required documents (to be submitted along with e-bids):
- PEC registration
- NTN Active
- KPPRA Active
- CNIC
- C&W Enlistment
Any bidder who provides incorrect / fake information should be recommended to the competent authority for debar/black listing and will be disqualified.
Bid validity: 90 days.
Bid submission and opening:
- Submission deadline (e-bids): 22-09-2026 at 12:00 PM.
- Bid opening: 22-09-2026 at 12:30 PM.
- Venue for sale of documents and venue of bid opening: Office of the Executive Engineer, C&W Highway Division, D.I. Khan.
Packages (summary):
| Package | Works (selected items listed in clipping) | Category | Estimated Amount | Bid Submission / Opening |
|---|---|---|---|---|
| Package-C | Rehabilitation of BTR of Paharpur city length-1.5 Kms; Construction of BTR Mathraah Abad Graveyard Road length-1.5 Kms; Construction of BTR Daaday Shaheed Wala Road length-1.50 Kms; Rehabilitation and widening of BTR from Yarik to Wanda Madat length-7 Kms; Rehabilitation of BTR from Village Qazi Khokar to Village Kala Gorh length-1.5 Kms; Construction of BTR from Qazi Pump Chashma Road to Wandi Buchra length-2.5 Kms; Rehabilitation of BTR from Meer ali Khel to kachi Katgarh length-1.5 Kms. | C-2 | 12.250 | 22-09-2026 Time 12.00 PM / 22-09-2026 Time 12.30 PM |
| Package-D | Construction of BTR Mandrhan Kalan Balance length 1.50-Km; Construction of BTR of Village Shanzeda Yarik length-1.5-Kms; Rehabilitation of BTR Village Saggu Shumali length-1.5-Kms; Rehabilitation of BTR Village Pir Qamar Sultan length-1.5-Kms; Construction of Village Phatan Kot to Awan length-1.50-Kms; Rehabilitation of BTR of Paharpur Bypass balance length-5.5-Kms; Construction of BTR of village Kirri Khaisoor length-2-Kms; Rehabilitation of BTR Village Kaala Paani length-1.5-Km; Rehabilitation of BTR Village of Behtaniyan Abad length-1.50-Kms; Rehabilitation and Improvement of BTR Village Wanda Bhutta length-1.50-Kms; Rehabilitation of BTR of Village Ghulam Koli Road length-2-Kms; Construction Jhoke Sipra Road length-2-Kms; Rehabilitation and Improvement of BTR of Village Jhoke Jahanir length-1.50-Kms. | C-2 | 12.400 | 22-09-2026 Time 12.00 PM / 22-09-2026 Time 12.30 PM |
| Package-E | Construction of BTR Village Darbani Sikandar 2-Kms; Construction of BTR from village Saria shareef to village Badar 2-Kms; Rehabilitation of BTR of village Garah Hayat / Garah Bakhsha Road length-2.5-Kms; Construction of BTR of village Haider length-1.5-Kms; Rehabilitation of BTR from Main Tank Dilian Road length-1.5-Kms; Rehabilitation of BTR in Kot Esa Khan length-1.5-Kms; Rehabilitation of BTR Garrah Fuzal Pota length-1.5-Kms; Rehabilitation of BTR from Main Tank Road to village Garrah Buhar length-2-Kms; Rehabilitation of BTR from Main Tank Road to village Kaniara length-2-Kms; Rehabilitation of BTR of Main Daraban Bazar Road length-1.5-Kms; Rehabilitation BTR Gandi Umar Khan City Roads length-1.5-Kms; Rehabilitation BTR Chauhdhary City Roads length-1.5-Kms; Rehabilitation BTR from Main Daraban Road to village Saggu 1.50-Kms. | C-2 | 14.250 | 22-09-2026 Time 12.00 PM / 22-09-2026 Time 12.30 PM |
Additional notes printed:
- Bids will be valid for Ninety (90) days.
- Contractor must submit the following documents alongwith three e-Bids: (1) PEC-2027 (2) NTN Active (3) KPPRA Active (4) CNIC (5) C&W Enlistment (the exact printed sequence appears in the clipping).
- Venue of bids opening is office of the Executive Engineer C&W Highway Division D.I.Khan.
Contact: Executive Engineer C&W Highway Division D.I. Khan. Ph: 0966-9205588
Reference / identification printed: INF(P)45/16/26
Published in The News International on Saturday, 5 September 2026. DailyAds.pk indexes newspaper advertisements; the original notice and the issuing organisation remain the source for final terms and eligibility.