
Municipal Committee Kamoke Tender Notice – Framework Contracts (FY 2026-27) – PEC C-6 & Above
Municipal Committee Kamoke Tender Notice – Framework Contracts (FY 2026-27) – PEC C-6 & Above · Kamoke, Gujranwala · Nawa-i-Waqt,
Tender advertisement published in Nawa-i-Waqt on Saturday, 5 September 2026, listed under Kamoke, Gujranwala, Pakistan. Issued by Municipal Committee Kamoke Tender Notice – Framework Contracts (FY 2026-27) – PEC C-6 & Above. The last date printed on the advertisement was Monday, 29 April 2024 and has passed.
The original image is temporarily unavailable. Use the source link or the details below. Open the full-size clipping Advertisement details
Office of the Municipal Committee, Kamoke (District Gujranwala) invites sealed tenders from engineering firms/contractors holding PEC license Category C-6 & above under Single-Stage One-Envelope procedure via the Punjab e-Procurement System for multiple framework work packages for the year 2026-27 (contracts valid up to 2027-06-30).
Key conditions: registration on the Punjab e-Procurement portal/PPRA website is mandatory; bids to be submitted/uploaded through the e-Procurement system; 5% bid security (as specified per package) required; applicable rules of PPRA 2014 and subsequent circulars apply; firms must hold a valid PEC license (C-6 or above) and meet other standard eligibility (tax/registration) requirements.
Submission & opening:
- Bid submission deadline (closing time via Punjab e-Procurement): 2024-04-29 at 14:00 (local time).
- Financial bid opening by the Tender Opening Committee: 2024-04-30 at 14:30 (local time).
- Procurement mode: Punjab e-Procurement Portal (online submission). Physical/hand-delivery of bids is not accepted except where specifically required in the bidding documents.
Issuer: Chief Officer / Municipal Committee, Kamoke.
Listed framework packages (scope summary, estimated cost and 5% bid security):
| Sr. | Scope / Name of Scheme (time frame up to 2027-06-30) | Estimated Cost (PKR) | 5% Bid Security (PKR) | PEC Category |
|---|---|---|---|---|
| 1 | Arrangements for national & religious occasions (Ramzan/Eid etc.) | 8,500,000 | 425,000 | C-6 & Above |
| 2 | Repair & maintenance of vehicle & machinery (incl. dewatering pumps, winching, cutter machines) | 8,000,000 | 400,000 | C-6 & Above |
| 3 | Repair & maintenance of parks, green belts, stadium, library | 3,500,000 | 175,000 | C-6 & Above |
| 4 | Beautification / tree plantation of parks & green belts (city area Kamoke) | 3,000,000 | 150,000 | C-6 & Above |
| 5 | Patch work / repair of roads in city area & other civil works | 6,000,000 | 300,000 | C-6 & Above |
| 6 | Cleaning of nallahs using excavator on rent | 3,500,000 | 175,000 | C-6 & Above |
| 7 | Repair of garage jackets, pumps & cleaning materials for MC offices/parks/stadium | 3,000,000 | 150,000 | C-6 & Above |
| 8 | Repair of motor/vacuum pump, panels, transformers & electrical works; manhole cover fixing | 2,000,000 | 100,000 | C-6 & Above |
| 9 | Repair of transformers/motors/pumps; repair of water supply pipelines; filtration works | 4,500,000 | 225,000 | C-6 & Above |
| 10 | Repair/maintenance of street lights; purchase/repair of poles, cables, meters, transformers | 3,500,000 | 175,000 | C-6 & Above |
| 11 | Repair of office buildings; purchase/hiring of photocopier & recording camera; admin block works | 6,500,000 | 325,000 | C-6 & Above |
| 12 | Purchase of dewatering pump items (delivery/suction pipes, foot valves, clamps, wrenches) | 3,000,000 | 150,000 | C-6 & Above |
| 13 | Purchase of office stationery (complete) | 1,500,000 | 75,000 | C-6 & Above |
Important: Refer to the bidding documents on the Punjab e-Procurement Portal for full tender instructions, exact bid submission procedure, required bid security instruments (call deposit/bank guarantee), validity periods, and additional eligibility conditions. Bidders must comply with PPRA and Punjab e-Procurement rules; incomplete or late bids will be rejected.
Published in Nawa-i-Waqt on Saturday, 5 September 2026. DailyAds.pk indexes newspaper advertisements; the original notice and the issuing organisation remain the source for final terms and eligibility.










