Multan Electric Power Company Limited (MEPCO)
Notice: Hybrid Public Hearing for Environmental Impact Assessment
This notice is for all affected communities, stakeholders, experts and members of the public who are interested in the projects listed below. A public hearing on the Environmental Impact Assessment (EIA) of these projects is required by the Environmental Protection Agency Punjab (EPA-Punjab) under Section 12 of the Punjab Environmental Protection Act 1997 (PEPA), amended 2012.
Project Names and Locations
| No. | Project | Location | District |
|---|---|---|---|
| 1 | Arifwala-II 132 kV Grid Station | Chak No. 6/67-EB, near Arifwala, approximately 193 km from Multan | Pakpattan |
| 2 | Dera Ghazi Khan-III 132 kV Grid Station | Near Dera Ghazi Khan, approximately 100 km from Multan | Dera Ghazi Khan |
| 3 | Khanewal-III 132 kV Grid Station | Chak No. 10/167, near Khanewal, approximately 60 km from Multan | Khanewal |
| 4 | Layyah-III 132 kV Grid Station | Approximately 130 km from Multan | Layyah |
| 5 | Rahim Yar Khan-III 132 kV Grid Station | Near Rahim Yar Khan, approximately 260 km from Multan | Rahim Yar Khan |
| 6 | Shah Jamal 132 kV Grid Station | Near Shah Jamal, approximately 85 km from Multan | Muzaffargarh |
Project Details
The proposed project covers the construction and operation of six 132 kV grid stations and their associated 132 kV transmission lines:
- 132 kV Arifwala-II grid station and associated in/out 132 kV transmission line
- 132 kV Dera Ghazi Khan-III grid station and associated in/out 132 kV transmission line
- 132 kV Khanewal-III grid station and associated in/out 132 kV transmission line
- 132 kV Layyah-III grid station and associated in/out 132 kV transmission line
- 132 kV Rahim Yar Khan-III grid station and associated in/out 132 kV transmission line
- 132 kV Shah Jamal grid station and associated in/out 132 kV transmission line
- Rehabilitation and extension of 46 nos. 11 kV feeders
The project falls under EDEIP. It is intended to relieve overloading of the existing system, reduce line losses and improve the reliability and quality of electricity supply to domestic, agricultural, commercial and industrial consumers, including small and medium enterprises (SMEs), in the project areas. The estimated project cost is approximately Rs. 38.49 billion.
Availability of the EIA Report
The EIA report can be accessed by stakeholders and the public at:
- EPA Punjab e-library: https://epd.punjab.gov.pk/elibrary
- Offices of the District Officers (Environment) of Pakpattan, Dera Ghazi Khan, Khanewal, Layyah, Rahim Yar Khan and Muzaffargarh
Affected persons and stakeholders may send written comments and suggestions on the EIA report to the Environmental Protection Agency Punjab, College Road, Gulberg-II, Lahore, before the hearing.
Public Hearing Schedule
| Date | Day | Time | Venue |
|---|---|---|---|
| 3 November 2026 | Tuesday | 11:00 am | MEPCO Sports Complex, Khanewal Road, Multan |
| Online link: https://zoom.us/j/96446461112 | |||
Procedure for Online Participation
- The EIA report can be downloaded from the EPA Punjab e-library at https://epd.punjab.gov.pk/elibrary.
- Online participants should join the meeting using their name.
- Questions and comments may be submitted through the chat box during the hearing.
Contact: Chief Engineer (Development), PMU, MEPCO Headquarters, Khanewal Road, Multan