DailyAds.pk
Saved
Tenders Closed 27 Aug 2026

KMC Engineering Dept. Tenders – LED Street Lighting & Rehabilitation Works (12 Packages)

KMC Engineering Dept. Tenders – LED Street Lighting & Rehabilitation Works (12 Packages) · Karachi · Jang,

Tender advertisement published in Jang on Friday, 31 July 2026, listed under Karachi. Issued by KMC Engineering Dept. Tenders – LED Street Lighting & Rehabilitation Works (12 Packages). The last date printed on the advertisement was Thursday, 27 August 2026 and has passed.

Newspaper clipping: KMC Engineering Dept. Tenders – LED Street Lighting & Rehabilitation Works (12 Packages), Jang, 31 Jul 2026 Open the full-size clipping
Original clipping · Jang · 31 Jul 2026 · tap to zoom

Advertisement details

Issuer: Karachi Metropolitan Corporation (KMC), Office of the Executive Engineer C.M (E&M), Engineering Department. Published: 28-07-2026. KMC invites online bids through the EPADS (SPPRA Sindh) e-Procurement system on Schedule Plus (Single Stage, One Envelope) for multiple street-lighting installation, improvement and rehabilitation packages in District Central, Karachi.

Key submission details:

  • Bid submission (ONLINE only) deadline: 2026-08-27 by 14:00. Online bid opening: 2026-08-27 at 14:30 (subject to public holiday rules).
  • Tender fee (each package): PKR 5,000 (to be paid as specified).
  • Bid security: 5% of the estimated cost (pay order in favour of Karachi Metropolitan Corporation to be uploaded online and physically submitted before bid closing).
  • Bidding documents: Download from EPADS (http://portalsindh.eprocurement.gov.pk) and all bids must be submitted online via the e-Procurement system.
  • Physical submission: Pay order, tender fee and supporting eligibility documents must be submitted in the Office of the Superintending Engineer (E&M), Engineering Department, KMC, 512 I.M. New M.A. Jinnah Road, Gurumander, Karachi before bid closing.
  • Other mandatory requirements include statutory affidavits (e.g., non-blacklisting), compliance with eligibility criteria, and adherence to SPPRA/EPADS rules.
  • Detailed terms, conditions and contract conditions are available on KMC's website: www.karachicity.gov.pk.

Available tender packages:

Ref. No. Work Estimated Cost (PKR) Bid Security Tender Fee (PKR)
KMC/C.M/E&M/166/2026-2027 Installation of LED Street Lights at Dak Khana Flyover, District Central 10,191,819 5% of estimated cost 5,000
KMC/C.M/E&M/167/2026-2027 Improvement / Rehabilitation of street lighting system at Liaquatabad Flyover to Manghopir, District Central 23,245,315 5% of estimated cost 5,000
KMC/C.M/E&M/168/2026-2027 Installation of LED Street Lights at Aisha Manzil Flyover, District Central 10,738,254 5% of estimated cost 5,000
KMC/C.M/E&M/169/2026-2027 Installation of LED Street Lights at Water Pump Flyover, District Central 21,033,987 5% of estimated cost 5,000
KMC/C.M/E&M/170/2026-2027 Installation of LED Street Lights at Sohrab Goth Flyover, District Central 7,043,656 5% of estimated cost 5,000
KMC/C.M/E&M/171/2026-2027 Improvement & Rehabilitation of street lighting system at Nagan Flyover (from Al Habib Restaurant to Al Hajj Akhtar Restaurant) including lower ramp, District Central 30,368,637 5% of estimated cost 5,000
KMC/C.M/E&M/172/2026-2027 Improvement / Rehabilitation of street lighting system at Sharah-e-Pakistan from Sohrab Goth to Water Pump Flyover, District Central 8,652,827 5% of estimated cost 5,000
KMC/C.M/E&M/173/2026-2027 Improvement / Rehabilitation of street lighting system at 5000 Road from Nagan Flyover to 4K Chowrangi North Karachi, District Central 9,432,631 5% of estimated cost 5,000
KMC/C.M/E&M/174/2026-2027 Improvement / Rehabilitation of street lighting system by using solar system at Sher Shah Bridge from Nagan Flyover to Board Office, District Central 13,542,695 5% of estimated cost 5,000
KMC/C.M/E&M/175/2026-2027 Improvement / Rehabilitation of street lighting system at Nawab Siddiq Ali Khan Road from Board Office to Golimar Chowrangi, District Central 14,177,158 5% of estimated cost 5,000
KMC/C.M/E&M/176/2026-2027 Improvement / Rehabilitation of street lighting system at Rashid Minhas Road from Lyari Expressway to Sohab Goth Flyover, District Central 12,642,430 5% of estimated cost 5,000
KMC/C.M/E&M/177/2026-2027 Improvement / Rehabilitation of street lighting system at Shahrah-e-Ilahi Sina Road from Gujar Nallah to Orang Nallah, District Central 20,804,461 5% of estimated cost 5,000

For detailed eligibility criteria, document checklists, and full terms & conditions refer to the bidding documents on EPADS or contact the Executive Engineer (C.M E&M), Engineering Department, KMC.

Published in Jang on Friday, 31 July 2026. DailyAds.pk indexes newspaper advertisements; the original notice and the issuing organisation remain the source for final terms and eligibility.

Jang · 31 Jul 2026
Fit