KMC Engineering Dept. Tenders – LED Street Lighting & Rehabilitation Works (12 Packages)
KMC Engineering Dept. Tenders – LED Street Lighting & Rehabilitation Works (12 Packages) · Karachi · Jang,
Tender advertisement published in Jang on Friday, 31 July 2026, listed under Karachi. Issued by KMC Engineering Dept. Tenders – LED Street Lighting & Rehabilitation Works (12 Packages). The last date printed on the advertisement was Thursday, 27 August 2026 and has passed.
The original image is temporarily unavailable. Use the source link or the details below. Open the full-size clipping Advertisement details
Issuer: Karachi Metropolitan Corporation (KMC), Office of the Executive Engineer C.M (E&M), Engineering Department. Published: 28-07-2026. KMC invites online bids through the EPADS (SPPRA Sindh) e-Procurement system on Schedule Plus (Single Stage, One Envelope) for multiple street-lighting installation, improvement and rehabilitation packages in District Central, Karachi.
Key submission details:
- Bid submission (ONLINE only) deadline: 2026-08-27 by 14:00. Online bid opening: 2026-08-27 at 14:30 (subject to public holiday rules).
- Tender fee (each package): PKR 5,000 (to be paid as specified).
- Bid security: 5% of the estimated cost (pay order in favour of Karachi Metropolitan Corporation to be uploaded online and physically submitted before bid closing).
- Bidding documents: Download from EPADS (http://portalsindh.eprocurement.gov.pk) and all bids must be submitted online via the e-Procurement system.
- Physical submission: Pay order, tender fee and supporting eligibility documents must be submitted in the Office of the Superintending Engineer (E&M), Engineering Department, KMC, 512 I.M. New M.A. Jinnah Road, Gurumander, Karachi before bid closing.
- Other mandatory requirements include statutory affidavits (e.g., non-blacklisting), compliance with eligibility criteria, and adherence to SPPRA/EPADS rules.
- Detailed terms, conditions and contract conditions are available on KMC's website: www.karachicity.gov.pk.
Available tender packages:
| Ref. No. | Work | Estimated Cost (PKR) | Bid Security | Tender Fee (PKR) |
|---|---|---|---|---|
| KMC/C.M/E&M/166/2026-2027 | Installation of LED Street Lights at Dak Khana Flyover, District Central | 10,191,819 | 5% of estimated cost | 5,000 |
| KMC/C.M/E&M/167/2026-2027 | Improvement / Rehabilitation of street lighting system at Liaquatabad Flyover to Manghopir, District Central | 23,245,315 | 5% of estimated cost | 5,000 |
| KMC/C.M/E&M/168/2026-2027 | Installation of LED Street Lights at Aisha Manzil Flyover, District Central | 10,738,254 | 5% of estimated cost | 5,000 |
| KMC/C.M/E&M/169/2026-2027 | Installation of LED Street Lights at Water Pump Flyover, District Central | 21,033,987 | 5% of estimated cost | 5,000 |
| KMC/C.M/E&M/170/2026-2027 | Installation of LED Street Lights at Sohrab Goth Flyover, District Central | 7,043,656 | 5% of estimated cost | 5,000 |
| KMC/C.M/E&M/171/2026-2027 | Improvement & Rehabilitation of street lighting system at Nagan Flyover (from Al Habib Restaurant to Al Hajj Akhtar Restaurant) including lower ramp, District Central | 30,368,637 | 5% of estimated cost | 5,000 |
| KMC/C.M/E&M/172/2026-2027 | Improvement / Rehabilitation of street lighting system at Sharah-e-Pakistan from Sohrab Goth to Water Pump Flyover, District Central | 8,652,827 | 5% of estimated cost | 5,000 |
| KMC/C.M/E&M/173/2026-2027 | Improvement / Rehabilitation of street lighting system at 5000 Road from Nagan Flyover to 4K Chowrangi North Karachi, District Central | 9,432,631 | 5% of estimated cost | 5,000 |
| KMC/C.M/E&M/174/2026-2027 | Improvement / Rehabilitation of street lighting system by using solar system at Sher Shah Bridge from Nagan Flyover to Board Office, District Central | 13,542,695 | 5% of estimated cost | 5,000 |
| KMC/C.M/E&M/175/2026-2027 | Improvement / Rehabilitation of street lighting system at Nawab Siddiq Ali Khan Road from Board Office to Golimar Chowrangi, District Central | 14,177,158 | 5% of estimated cost | 5,000 |
| KMC/C.M/E&M/176/2026-2027 | Improvement / Rehabilitation of street lighting system at Rashid Minhas Road from Lyari Expressway to Sohab Goth Flyover, District Central | 12,642,430 | 5% of estimated cost | 5,000 |
| KMC/C.M/E&M/177/2026-2027 | Improvement / Rehabilitation of street lighting system at Shahrah-e-Ilahi Sina Road from Gujar Nallah to Orang Nallah, District Central | 20,804,461 | 5% of estimated cost | 5,000 |
For detailed eligibility criteria, document checklists, and full terms & conditions refer to the bidding documents on EPADS or contact the Executive Engineer (C.M E&M), Engineering Department, KMC.
Published in Jang on Friday, 31 July 2026. DailyAds.pk indexes newspaper advertisements; the original notice and the issuing organisation remain the source for final terms and eligibility.