Tender: Supply, Installation & Commissioning for 18 MW HEP — W&P Department, Gilgit-Baltistan (16 July 2026)
Tender advertisement published in Dawn on Friday, 17 July 2026, listed under Gilgit.
Similar tenders
All tendersMore tenders
Advertisement details
Office of the Executive Engineer, Gilgit-Baltistan Hydro Electric Workshop, Water & Power Department, Gilgit invites sealed bids (single-stage single-envelope procedure) for supply, installation and commissioning works for an 18 MW HEP as per Notice Inviting Tender dated 16 July 2026.
Key mandatory eligibility and submission requirements:
| Requirement | Details (as stated) |
|---|---|
| Issuer / Procuring Entity | Office of the Executive Engineer, Gilgit-Baltistan Hydro Electric Workshop, Water & Power Department, Gilgit |
| Tender type | Sealed bids; single-stage single-envelope bidding procedure |
| Name of work | Supply, Installation & Commissioning — 18 MW HEP |
| PEC / registration | Valid PEC registration in appropriate category and code (mandatory) |
| Enlistment | Bidder must be enlisted/registered with Water & Power Department (mandatory) |
| OEM authorization | Authorization certificate from the original equipment manufacturer (OEM) must be produced (mandatory) |
| Manufacturer experience | Manufacturer must possess a minimum of ten years documented experience in production of sets with expertise in turbine runners; proven experience manufacturing runners of minimum 3 MW in Pakistan with completion certificates from regional offices (mandatory) |
| Financial evidence | Bank credit certificate for a minimum of PKR 50,000,000 and bank statements showing minimum transactions of PKR 8,500,000 (as stated) |
| Completion period | Completion period: 94 months after issuance of commencement order (as stated) |
| Tender documents | Can be purchased from the office of the Executive Engineer, GBHEW Division, Gilgit during office hours on cash payment (non-refundable) |
| Other | Procuring entity reserves the right to reject any or all proposals |
Prospective bidders should obtain the full tender documents from the Executive Engineer's office to confirm detailed scope, bid submission deadline, bid security and submission procedure before preparing proposals.
Published in Dawn on Friday, 17 July 2026. DailyAds.pk indexes newspaper advertisements; the original notice and the issuing organisation remain the source for final terms and eligibility.