SEPCO Invitation to E‑Bids for Distribution Material (Oct 2026)
Tender advertisement published in Jang on Saturday, 26 September 2026, listed under Sukkur. The last date printed on the advertisement was Thursday, 15 October 2026 and has passed.
Similar tenders
All tendersMore tenders
Advertisement details
Issuer: Sukkur Electric Power Company (SEPCO)
Title: Invitation to E‑Bid(s) for procurement of distribution material for SEPCO Regional Stores (Rohri & Larkana)
Method of Procurement: Single Stage-One Envelope Procedure on EPADS v2.0 (e‑tendering) on FCS basis (free delivery to Consignee's Stores). Procurement will be carried out as per PPRA Rule 36(a).
Eligibility: Firms / Manufacturers registered / prequalified with NTDC/WAPDA/PPMVC/any DISCO. For LT Bushes both Manufacturers & General Order Suppliers shall be eligible. Bidders must be registered with Income Tax and Sales Tax authorities and listed on the Active Taxpayers List (ATL) of FBR. Registered users on EPADS v2.0 may download bidding documents.
Submission: All bids must be submitted electronically via EPADS v2.0. Manual bids will not be accepted. Bid security in the form and amount specified in bidding documents is required; original bid security must be submitted to the Procuring Agency before bid closing where applicable.
Notes:
- Bidding documents, terms, conditions, specifications and requirements are available to registered bidders on EPADS v2.0.
- Those not registered on EPADS v2.0 should register and obtain user ID to participate.
- Electronic bids must be uploaded on EPADS v2.0 on scheduled date & time; manual bids will not be accepted.
Detailed list of distribution material, submission deadlines, opening dates/times and EPADS reference numbers:
| Sr. No. | Tender No. | Item Description | Unit | Qty | Submission Date | Submission Time | Opening Date | Opening Time | EPADS Ref. No. |
|---|---|---|---|---|---|---|---|---|---|
| M-1 | 139926 | 50 KVA Distribution Transformer | No | 200 | 14.10.26 | 10:00 AM | 14.10.26 | 11:00 AM | P127939 |
| M-1 | 140026 | 100 KVA Distribution Transformer | No | 200 | 14.10.26 | 10:15 AM | 14.10.26 | 11:15 AM | P127942 |
| M-1 | 140276 | 200 KVA Distribution Transformer | No | 200 | 14.10.26 | 10:30 AM | 14.10.26 | 11:30 AM | P127943 |
| M-6 | 140276 | HT Steel Structure 4" | No | 500 | 14.10.26 | 10:30 AM | 14.10.26 | 12:00 PM | P127954 |
| M-6 | 140276 | HT Steel Structure 3/8" | No | 500 | 14.10.26 | 10:30 AM | 14.10.26 | 12:05 PM | P127955 |
| M-6 | 140276 | 11KV Cross Arm Steel | No | 4500 | 14.10.26 | 10:30 AM | 14.10.26 | 12:10 PM | P127956 |
| M-6 | 140276 | Steel Cross Arms for D‑Fitting Mounting | No | 2000 | 14.10.26 | 10:30 AM | 14.10.26 | 12:15 PM | P127957 |
| M-8 | 141026 | 11KV Pin (Steel Cross) | No | 3000 | 14.10.26 | 10:30 AM | 14.10.26 | 12:30 PM | P127958 |
| M-8 | 141026 | 11KV Disc Insulator | No | 20000 | 14.10.26 | 10:30 AM | 14.10.26 | 12:35 PM | P127959 |
| M-8 | 141026 | HV Fitting Drop Out Cut Out (With Fuses & Spares) | No | 3000 | 14.10.26 | 10:30 AM | 14.10.26 | 12:45 PM | P127961 |
| M-9 | 141026 | Meter Security Box A‑Type 200/5 AMPS | No | 500 | 14.10.26 | 10:30 AM | 14.10.26 | 12:50 PM | P127962 |
| M-13 | 141126 | Earthing Unit | No | 20000 | 14.10.26 | 11:00 AM | 14.10.26 | 11:05 AM | P127975 |
| M-14 | 141226 | Fresh Transformer Oil | Liter | 30000 | 14.10.26 | 11:15 AM | 14.10.26 | 11:15 AM | P127976 |
| M-14 | 141226 | Double Axle Trolley for 200 kva stand by TF | No | 50 | 14.10.26 | 11:30 AM | 14.10.26 | 11:45 AM | P127981 |
| M-14 | 141226 | P.G Connector T‑110 | No | 15000 | 14.10.26 | 11:45 AM | 14.10.26 | 11:45 AM | P127984 |
| M-14 | 141226 | P.G Connector T‑10 | No | 10000 | 14.10.26 | 11:45 AM | 14.10.26 | 11:50 AM | P127985 |
| M-14 | 141226 | D‑Shackle (Assembly) | No | 10000 | 14.10.26 | 11:45 AM | 14.10.26 | 12:00 PM | P127987 |
| M-14 | 141226 | Dead End Clamp (Rabbit & Dog) | No | 10000 | 14.10.26 | 11:45 AM | 14.10.26 | 12:05 PM | P127988 |
| M-14 | 141226 | ACSR Conductor DOG | KM | 400 | 14.10.26 | 11:45 AM | 14.10.26 | 12:10 PM | P127989 |
| M-14 | 141226 | ACSR Conductor RABBIT | KM | 1500 | 14.10.26 | 11:45 AM | 14.10.26 | 12:15 PM | P127990 |
| M-14 | 141226 | AA Conductor | KM | 100 | 14.10.26 | 11:45 AM | 14.10.26 | 12:20 PM | P127991 |
| M-14 | 141226 | PVC 2 Core 0.75/2 | KM | 200 | 14.10.26 | 11:45 AM | 14.10.26 | 12:25 PM | P127992 |
| M-14 | 141226 | 11KV XLPE Power Cable S/Core 500 MCM | KM | 100 | 15.10.26 | 10:30 AM | 15.10.26 | 12:30 PM | P128005 |
| M-14 | 141226 | 11KV XLPE Power Cable 3/C 4/0 AWG | KM | 100 | 15.10.26 | 10:30 AM | 15.10.26 | 12:35 PM | P128006 |
| M-14 | 141226 | ABC Cable 3x95+95 mm2 | KM | 100 | 15.10.26 | 10:30 AM | 15.10.26 | 12:40 PM | P128007 |
| M-14 | 141226 | ABC Cable 3x70+70 mm2 | KM | 100 | 15.10.26 | 10:30 AM | 15.10.26 | 12:45 PM | P128008 |
| 24 | 142226 | LT Bushing Rod (Complete in all respect) including Porcelain Bushes for 25KVA, 50KVA, 100KVA Transformer (Amendment No. 06) as per Drawing No. EWDF 406 | No | 2,934 | 15.10.26 | 10:30 AM | 15.10.26 | 01:30 PM | P129001 |
| 24 | 142226 | LT Bushing Rod (Complete in all respect) including Porcelain Bushes for 25KVA, 50KVA, 100KVA Transformer (Amendment No. 06) as per Drawing No. EWDF 406 | No | 1,956 | 15.10.26 | 10:30 AM | 15.10.26 | 01:45 PM | P129002 |
| 24 | 142226 | LT Bushing Rod (Complete in all respect) including Porcelain Bushes for 200KVA Transformer (Amendment No. 06) as per Drawing No. EWDF 406 | No | 1,194 | 15.10.26 | 10:30 AM | 15.10.26 | 01:55 PM | P129003 |
| 24 | 142226 | LT Bushing Rod (Complete in all respect) including Porcelain Bushes for 200KVA/100KVA Transformer (Amendment No. 06) as per Drawing No. S&S/DTF-LTB 006 | No | 796 | 15.10.26 | 10:30 AM | 15.10.26 | 01:45 PM | P129004 |
Contact / Submission of Original Documents:
Manager (Material Management), SEPCO
Address: Old Thermal Power Station, Old Sukkur
Phone: 071-9310798, 071-5620079
Fax: 071-9310797
E‑mail: arif.bhutto@sepco.com.pk
Advertisement / PID: PID(H) 83/2026
Published in Jang on Saturday, 26 September 2026. DailyAds.pk indexes newspaper advertisements; the original notice and the issuing organisation remain the source for final terms and eligibility.