Addendum No.1 — Procurement of Electrical & Solar PV Systems for Lahore and Multan Rail Subsystem (Punjab Mass Transit Authority)
Addendum No.1 · Lahore · Jang,
Tender advertisement published in Jang on Wednesday, 23 September 2026, listed under Lahore. Issued by Addendum No.1.
The original image is temporarily unavailable. Use the source link or the details below. Open the full-size clipping Advertisement details
Punjab Mass Transit Authority (Directorate Procurement) issues Addendum No. 1 for the procurement titled “Supply / Installation / Replacement / Maintenance of Electrical System / Solar PV System / Equipment(s) from Shahdra to Gajju Matta at designated places in Lahore and Multan Railway Subsystem.” Bidders should note the referenced advertisement and download bidding documents from the listed official websites.
| Issuer | Punjab Mass Transit Authority — Directorate Procurement |
|---|---|
| Addendum | Addendum No. 1 |
| Procurement Scope | Supply, installation, replacement and maintenance of electrical systems, Solar PV systems and related equipment |
| Location | From Shahdra to Gajju Matta at designated places in Lahore and Multan railway subsystem |
| Advertisement Reference | Advertisement bearing IL-9408 published in national daily newspapers and Express Tribune on 9 September, 2026 and 13 September, 2026 (as referenced) |
| How to obtain bidding documents | Download from PMA website and PPRA website and Punjab e-Procurement System: www.pma.punjab.gov.pk www.ppra.punjab.gov.pk https://eproc.punjab.gov.pk |
| Contact / Address | Directorate Procurement, Punjab Mass Transit Authority, 5th Floor, ASTP, 346-B, Main Ferozepur Road, Lahore, Pakistan. Tel: +92 (42) 99028000. Fax: +92 (42) 99232541. Email: [email protected] |
Follow the official websites and the Directorate Procurement contact for full bidding documents, clarifications and submission instructions.
Published in Jang on Wednesday, 23 September 2026. DailyAds.pk indexes newspaper advertisements; the original notice and the issuing organisation remain the source for final terms and eligibility.