DailyAds.pk
Saved
Tenders Closed 10 Sep 2026

C&W Division Swabi-I E‑Bidding Notice for Swabi Area Development Projects (Hydel Profit Funded)

C&W Division Swabi-I E‑Bidding Notice for Swabi Area Development Projects (Hydel Profit Funded) · Swabi · Nawa-i-Waqt,

Tender advertisement published in Nawa-i-Waqt on Wednesday, 19 August 2026, listed under Swabi. Issued by C&W Division Swabi-I E‑Bidding Notice for Swabi Area Development Projects (Hydel Profit Funded). The last date printed on the advertisement was Thursday, 10 September 2026 and has passed.

Newspaper clipping: C&W Division Swabi-I E‑Bidding Notice for Swabi Area Development Projects (Hydel Profit Funded), Nawa-i-Waqt, 19 Aug 2026 Open the full-size clipping
Original clipping · Nawa-i-Waqt · 19 Aug 2026 · tap to zoom

Advertisement details

Government of Khyber Pakhtunkhwa, Communication & Works Department, Executive Engineer C&W Division Swabi‑I invites sealed E‑Bidding (Single Stage Two Envelope System) from eligible firms/contractors for multiple rehabilitation, construction and solarization works under Swabi Area Development Project (Block provision funded from 10% Net Hydel Profit) for FY 2025‑26 (PK‑49 & PK‑50 ADP Nos. 2253/250727).

S. No.WorkPEC CategoryTender FeeBid SecurityPeriod of Completion
A‑1 Solarization of Masajids and Madrassas at Tehsil Topi and Gadoon C‑4 & above (with relevant code) 0.03% of estimated cost 2% of estimated cost As per work order
A‑2 Construction / Rehabilitation: Flood affected Kotha Topi Causeway C‑4 & above (with relevant code) 0.03% of estimated cost 2% of estimated cost As per work order
A‑3 Construction / Rehabilitation / BT / PCC: Dagai Shingrai Road at Gadoon (2.3 km) C‑5 & above (with relevant code) 0.03% of estimated cost 2% of estimated cost As per work order
A‑4 Construction / Rehabilitation / BT / PCC: Hamlet Kyara Zako Road (1.20 km) C‑5 & above (with relevant code) 0.03% of estimated cost 2% of estimated cost As per work order
A‑5 Construction / Rehabilitation / BT / PCC: Malak Abad to Takail Road (1.00 km) C‑5 & above (with relevant code) 0.03% of estimated cost 2% of estimated cost As per work order
B‑6 Solarization of Mosques in (PK‑50) & RHC Marghuz in (PK‑50) C‑5 & above (with relevant code) 0.03% of estimated cost 2% of estimated cost As per work order
B‑7 Solarization of Mosques in (PK‑50) C‑5 & above (with relevant code) 0.03% of estimated cost 2% of estimated cost As per work order
B‑8 Construction / Rehabilitation of Markazi Jarnia Masjid Usman Khel Baja C‑5 & above (with relevant code) 0.03% of estimated cost 2% of estimated cost As per work order

Key instructions and procurement requirements:

  • Submission method: Electronic e‑bidding via the E‑PAD system (single stage two envelope).
  • Bid documents: Downloadable from E‑PAD and KPPRA websites. For clarifications, obtain from procuring office on formal application, valid/up‑to‑date PEC registration, C&W registration card and payment of non‑refundable printing fee Rs.3,000/‑.
  • Affidavit: Bidders must submit affidavit on stamp paper in Technical Proposal affirming authenticity of CDR enclosed in financial bid; absence renders bidder non‑responsive.
  • Originals: Original Call Deposit for Bid Security, additional security (if applicable) and Tender Fee must reach the office before closing date/time.
  • Registration: Bidders must be registered with the Khyber Pakhtunkhwa Revenue Authority as required.
  • Pre‑bid meeting: Scheduled for 2026‑07‑10 at the office of Executive Engineer C&W Division Swabi‑I.
  • Bid opening venue: Office of the Executive Engineer C&W Division Swabi‑I.
  • Contact: Executive Engineer C&W Division Swabi‑I, Phone: 0938‑920077, Email: [email protected]. Tender notice ref: INF(P)4251/2026.

Note: All terms & conditions, KPPR amended rules and detailed requirements are available on the C&W Department official website or from the office during working hours.

Published in Nawa-i-Waqt on Wednesday, 19 August 2026. DailyAds.pk indexes newspaper advertisements; the original notice and the issuing organisation remain the source for final terms and eligibility.

Nawa-i-Waqt · 19 Aug 2026
Fit