· Pakistan’s newspaper advertisement archive
DailyAds.pk
Saved
Tenders Closed 14 Oct 2026

SEPCO Invitation to E‑Bids — Distribution Transformers, HT/LT Structures, Cables & Electrical Materials (Oct 2026)

SEPCO Invitation to E‑Bids · Sukkur · Jang,

Tender advertisement published in Jang on Saturday, 26 September 2026, listed under Sukkur. Issued by SEPCO Invitation to E‑Bids. The last date printed on the advertisement was Wednesday, 14 October 2026 and has passed.

Similar tenders

All tenders

Advertisement details

Issuer: Sukkur Electric Power Company (SEPCO) — Manager (Material Management), Old Thermal Power Station, Old Sukkur.

Purpose: Invitation to electronic bids (e-bids) from registered / prequalified firms, manufacturers and general order suppliers for procurement of distribution material (item wise rates) under single-stage, single-envelope e-tendering procedure on an FCS (Free Delivery to Consignee's Stores) basis through EPADS v2.0.

Method of procurement: Procurement will be conducted under PPRA Rule 36(a) and will be on "Single Stage-One Envelope Procedure" on FCS basis. Delivery to Consignee's Stores/Regional Store SEPCO Rohri & Larkana.

Eligibility / participation requirements:

  • Bidders must be registered / prequalified with NTDC/MWAPDA/PPMCL/any DISCO (as applicable) — both Manufacturers & General Order Suppliers are eligible to participate as specified in tender documents.
  • Bidders must be registered with Income Tax and Sales Tax authorities and be listed on the Active Taxpayers List (ATL).
  • Submission of bids is electronic only via EPADS v2.0; manual bids will not be accepted.
  • Tender documents, conditions and specifications are available on EPADS v2.0 portal.

Tender details (distribution material) — submission and opening schedule:

Sr. Category Tender No. Item Description Unit Qty Submission (Date / Time) Opening of Bids (Date / Time) EPADS Reference
M-1 139926 50 KVA Distribution Transformer No 200 14.10.26 10:30 AM 14.10.26 11:10 AM P127939
M-1 140026 100 KVA Distribution Transformer No 200 14.10.26 10:30 AM 14.10.26 11:15 AM P127942
M-1 140126 200 KVA Distribution Transformer No 200 14.10.26 10:30 AM 14.10.26 11:30 AM P127943
M-6 140326 HT Steel Structure 4/8" No 500 14.10.26 10:30 AM 14.10.26 12:00 PM P127951
M-6 140426 HT Steel Structure 3/8" No 500 14.10.26 10:30 AM 14.10.26 12:05 PM P127952
M-6 140526 11KV Cross Arm Steel No 4500 14.10.26 10:30 AM 14.10.26 12:20 PM P127953
M-6 140626 11 KV Cross Arm for D-Fitting Mounting No 2000 14.10.26 10:30 AM 14.10.26 12:30 PM P127954
M-13 141026 11KV Pin (Steel Cross) No 2000 14.10.26 10:30 AM 14.10.26 12:35 PM P127956
M-13 141126 11KV Disc Insulator No 3000 14.10.26 10:30 AM 14.10.26 12:45 PM P127957
M-13 141226 11KV Drop Out Cut Out (With Fuses & Spares) No 2000 14.10.26 10:30 AM 14.10.26 1:05 PM P127958
M-12 141026 Meter Security Box A-Type 2005 AMPS No 500 14.10.26 10:30 AM 14.10.26 1:10 PM P127962
M-13 141126 Earthing Unit No 20000 14.10.26 10:30 AM 14.10.26 1:15 PM P127975
M-12 141226 Fresh Transformer Oil Ltr 30000 14.10.26 10:30 AM 14.10.26 1:20 PM P127978
M-12 141426 Double Axle Trolley for 200 kva stand by TF No 50 14.10.26 10:30 AM 14.10.26 1:40 PM P127984
M-11 141526 P.G. Connector T-110 No 10000 14.10.26 10:30 AM 14.10.26 1:45 PM P127986
M-11 141626 P.G. Connector T-140 No 10000 14.10.26 10:30 AM 14.10.26 1:50 PM P127987
M-11 141726 D-Shackle Assembly No 10000 14.10.26 10:30 AM 14.10.26 2:00 PM P127988
M-11 141826 Dead End Clamp (Rabbit & Dog) No 10000 14.10.26 10:30 AM 14.10.26 2:10 PM P127989
M-9 141926 ACSR Conductor DOG K.M 400 14.10.26 10:30 AM 14.10.26 2:20 PM P127997
M-9 142026 ACSR Conductor RABBIT K.M 1500 14.10.26 10:30 AM 14.10.26 2:30 PM P127998
M-9 142126 AA Conductor ANR K.M 100 14.10.26 10:30 AM 14.10.26 2:40 PM P127999
M-9 142226 PVC 2 Core 0.75/2 K.M 200 14.10.26 10:30 AM 14.10.26 2:45 PM P128000
M-8 142326 XLPE Power Cable S/Core 500 MCM K.M 100 15.10.26 10:30 AM 15.10.26 12:30 PM P128005
M-8 142426 15KV XLPE Power Cable 3/C 4/0 AWG K.M 200 15.10.26 10:30 AM 15.10.26 12:35 PM P128006
M-8 142526 ABC Cable 3x95+95 mm2 K.M 100 15.10.26 10:30 AM 15.10.26 12:50 PM P128009
M-8 142626 ABC Cable 3x70+70 mm2 K.M 100 15.10.26 10:30 AM 15.10.26 1:05 PM P128010
M-8 142726 LT Bushing Rod (Complete in all respect) including Porcelain Bushes for 25kVA, 50kVA, 100kVA Transformer (Amendment No. 03) as per Drawing No. EWDF-406 No 2,934 15.10.26 10:30 AM 15.10.26 1:45 PM P129001
M-8 142826 LT Bushing Rod (Complete in all respect) including Porcelain Bushes for 25kVA, 50kVA, 100kVA Transformer (Amendment No. 03) as per Drawing No. S&S/DTL-TB No 1,956 15.10.26 10:30 AM 15.10.26 1:50 PM P129002
M-8 142926 LT Bushing Rod (Complete in all respect) including Porcelain Bushes for 200kVA Transformer (Amendment No. 03) as per Drawing No. EWDF 406 No 1,194 15.10.26 10:30 AM 15.10.26 1:55 PM P129003
M-8 143026 LT Bushing Rod (Complete in all respect) including Porcelain Bushes for 200kVA Transformer (Amendment No. 03) as per Drawing No. S&S/DTL-TB No 796 15.10.26 10:30 AM 15.10.26 1:45 PM P129004

Notes on bidding procedure and documents:

  • E-bidding documents, containing detailed terms and conditions, specifications and requirements are available for registered bidders on EPADS v2.0 and the e-bids are to be submitted on EPADS v2.0.
  • Those vendors who have not registered on the new version of EPADS v2.0 may register themselves on https://vendors.epads.gov.pk/; a tutorial to explain the registration process is available at https://link provided on EPADS (as referenced in tender).
  • Manual bids shall not be accepted. Original bid security as required shall be submitted as specified in tender documents (e.g., Bank Guarantee / CDR / Banker Cheque) where asked.
  • Bid validity period: 100 days for certain tenders (Tender No. 139926 to 141426 & 142226) and 75 days for others (Tender No. 141526 to 142126) as specified.
  • All e-bids must comply with instructions contained in bidding documents; late bids will not be entertained.

Contact for queries and submission support:

Manager (Material Management), SEPCO
Address: Old Thermal Power Station Old Sukkur
Phone: 071-9310798, 071-5620079
Fax: 071-9310797
Email: arif.bhutto@sepco.com.pk

Advertisement / PID reference: PID(H) 83/2026.

Prospective bidders should review individual tender packages on the EPADS portal for full specifications, quantities, bid security, submission times and exact opening schedule.

Published in Jang on Saturday, 26 September 2026. DailyAds.pk indexes newspaper advertisements; the original notice and the issuing organisation remain the source for final terms and eligibility.

Links printed in the advertisement

Also in Jang · 26 Sep 2026

See all ads
Jang · 26 Sep 2026
Fit