KP Communication & Works Dept — Tender for Physical Rehabilitation Works at Paraplegic Center Hayatabad, Peshawar
KP Communication & Works Dept · Peshawar · The News International,
Tender advertisement published in The News International on Saturday, 10 October 2026, listed under Peshawar. Issued by KP Communication & Works Dept. The last date printed on the advertisement was Monday, 2 November 2026 and has passed.
Similar tenders
All tendersMore tenders
Advertisement details
Government of Khyber Pakhtunkhwa, Communication and Works Department
Notice Inviting Tender through EPAD System (Single Stage Two Envelope Procedure)
The Government of Khyber Pakhtunkhwa (Mega Projects) Division-I, C&W Department, Peshawar invites electronic bids from eligible firms/contractors for the work below. Bidding follows the KPPRA Procurement Rules 2014 (amended) under the Single Stage Two Envelope procedure. Bidders must be registered with the Khyber Pakhtunkhwa Revenue Authority (KPRA) and the Pakistan Engineering Council (PEC) in the relevant category or field of specialization. Firms enlisted with C&W that have adequate financial soundness, relevant experience, personnel capabilities, required equipment and other requirements set out in the ITB/Bidding Documents can take part.
| S/No | Name of Work | Required Category of PEC & Relevant Codes / Enlistment Category | Bidding Security @2% I/C Stamp Duty (M) | Bidding Entry Fee @ 0.03% (Non-Refundable) (M) | Period of Completion | Last Date of Submission and Time | Date of Opening of Technical Bid | Date of Opening of Financial Bid |
|---|---|---|---|---|---|---|---|---|
| 1 | 210478 – Construction of Wards, OPD, Gyms, Private Rooms and Offices for the Comprehensive Physical Rehabilitation of People with Stroke and Closed Head Injuries, at Paraplegic Center (Hayatabad) Peshawar (PCP) | C-2 and above, having specialized codes as detailed in bidding documents | 10.464 | 0.156 | As per work order | 02.11.2026 at 11:00 hours | On the same day at 11:30 hours | To be announced after approval of the Technical Bid from the Competent Authority |
Terms and conditions:
- Bidding solicitation documents, with the bidding criteria and instructions to bidders, can be downloaded from the official EPADS website before the submission deadline. They can also be obtained from the office of the Executive Engineer, Mega Projects Division-I, Peshawar C&W Department. Bids submitted without the required documents, or with incomplete documents, will not be processed further for technical evaluation. The NIT is available on the C&W website (www.cwd.gk.pk) and the KPPRA website (www.kppra.gov.pk).
- The original Call Deposit Receipts (CDRs) for bid security and stamp duty, from scheduled banks, are mandatory. The bid entry fee (non-refundable) of 0.03% of the estimated cost is also mandatory. Bids without these will not be considered. These documents must be enclosed with the technical proposal and must reach the office of the Executive Engineer, Mega Projects Division-I Peshawar C&W Department before the prescribed closing date and time.
- A contractor may quote up to 10% below the Engineering Estimate and submits bid security at 2% only of the Engineering Estimate.
- A contractor quoting more than 10% and up to 20% below the Engineering Estimate must submit additional bid security of 8% of the Engineering Estimate, on top of the mandatory 2% bid security.
- A bid that is not accompanied by the required additional security will be considered non-responsive.
- In that case the 2% bid security will be forfeited in favour of the government, and the second lowest bidder, and so on, will be considered accordingly.
- A contractor quoting more than 20% below the Engineering Estimate must submit additional security equal to the difference between the quoted bid amount and the Engineering Estimate.
- This must be accompanied by a detail rate analysis/justification, as required under the applicable procurement rules.
- If the bidder does not provide the required additional security and supporting rate analysis, the bid will be rendered non-responsive.
- All securities submitted with such a non-responsive bid will be forfeited in favour of the government, and the second lowest bidder, and so on, will be considered accordingly.
- If the detailed rate analysis submitted with the bid is not convincing in the view of the procuring entity, the Head of the procuring entity may declare the bid non-responsive. This is without any forfeiture of bid securities, and the reasons will be recorded.
- All bidding is conducted through E-PAD. The technical and financial bids must be submitted electronically through E-PADS. A hard copy of the technical bid (the office record) must be submitted in sealed envelopes. The envelopes must be clearly marked "Technical & Financial Bids" with the name of the project/work and sent by courier to the undersigned office before the closing time.
- Technical evaluation will be carried out on the E-Pad system on the following criteria: experience record, personal capabilities, equipment capabilities, financial soundness and QCR-rated audit reports of the last three years. A proper marking criteria, as approved by the competent authority, will be applied. Failure to meet the prescribed qualifying criteria will lead to disqualification of the bidder.
- All bidders must fulfil the mandatory requirements prescribed in the ITB; otherwise the bid will be treated as non-responsive.
- Bidders must quote rates electronically ABOVE/BELOW/AT PAR for both the BOQ/Engineer Estimate, based on MRS and NSI items, on E-PADS.
- The successful bidder will pay all admissible taxes, including stamp duty, charges, sale tax and any other prevailing taxes, as applicable.
- Bid security must be in the form of a Call Deposit, issued by scheduled banks from the respective bank accounts of the contractor/firm, in favour of the Executive Engineer C&W Mega Project-1. Only this form is acceptable. Pay orders and bank drafts will not be accepted. Any bid submitted otherwise will be declared non-responsive.
- The complete details of the CDR must be entered or submitted electronically through E-PADS and also provided in the technical bid documents. These details include the CDR number, name of bank, date, and the amount required.
- The bid security in the form of an original call deposit must be kept sealed in the financial proposal. The bidder must also submit an affidavit on stamp paper along with the technical proposal. The affidavit must state that a bid security amounting to 02% has been placed in the financial proposal or bid, without stating the figure in the letter. Otherwise the technical proposal will be considered non-responsive and will be returned to the bidder after being examined by the procurement committee, as per KPPRA Rule 2014.
- The bid security of the 1st, 2nd and 3rd lowest bidders will be retained by the Authority until the contract with the successful bidder is signed.
- If the evaluated bid cost of two or more bidders is equal, the successful bidder will be declared as per KPPRA rules.
- Technical bids will be opened in the office of the Executive Engineer C&W Mega Project-I Peshawar on the fixed date and time.
- Financial bids will be opened electronically through E-PADS after the technical evaluation is complete and the technical evaluation report has been approved by the competent Authority.
- They will be opened in the office of the Executive Engineer C&W Mega Project-I Peshawar.
- The date will be communicated through official letter, and only to technically qualified bidders.
- The evaluation report will be uploaded on E-PADS, KPPRA and the C&W website.
- The procuring entity reserves the right to reject any or all bids at any time prior to acceptance of the bid, in accordance with KAPPRA rules.
- All information and documents submitted by bidders must be based on facts, beyond any doubt.
- If any misrepresentation, false statement, concealment of facts, or submission of forged/fake documents is found during evaluation, the bid may be rejected.
- Such conduct may also render the bidder liable for debarment/blacklisting and other action under the applicable rules.
- Any misrepresentation detected during the currency of the contract will be dealt with in accordance with law and the applicable procurement rules.
- Joint Ventures (JVs) are allowed, subject to submission of a valid JV agreement and compliance with PEC/KPPRA requirements. The JV must be registered with the office of the registrar, and the Form-H/JV agreement must be submitted, as applicable.
- The procuring entity is not responsible for any technical fault, glitch or error in the E-PADS system. It will consider only the documents appearing on the EPADS dashboard, so bidders are advised to upload the required documents carefully and responsibly.
- A pre-bid meeting will be held on 19th October, 2026 in the office of the undersigned.
- Any condition or instruction not covered here will be dealt with in light of the KPPRA rules.
Executive Engineer
(Mega Projects) Division-I, Peshawar
Ph: 091-9213248
INF(P)5155/26
Published in The News International on Saturday, 10 October 2026. DailyAds.pk indexes newspaper advertisements; the original notice and the issuing organisation remain the source for final terms and eligibility.