Tender: 25 Flood-Protection Works & Solar Tube-Well Installation — Irrigation Division Haripur (E-Bidding)
Tender advertisement published in Daily Mashriq on Sunday, 2 August 2026, listed under Haripur. The last date printed on the advertisement was Monday, 17 August 2026 and has passed.
Similar tenders
All tendersMore tenders
Advertisement details
Issuer: Executive Engineer Haripur Irrigation Division, Haripur (Government of Khyber Pakhtunkhwa)
Notice: Invitation for E-Bidding (EPADS) — Single Stage Single Envelope Procedure (2nd Time) for 25 separate works (mainly flood protection works at multiple nullahs / villages of District Haripur and installation of a solar system for an existing irrigation tube well at Kamalpur).
Submission / Opening: Electronic bids through EPADS. Original call deposit (bid security) in approved form must be submitted in support of the online bid as required in the tender documents.
How to obtain documents: Bid solicitation documents including instructions to bidders can be downloaded from Irrigation website and KPPRA website.
| Sr | Work Name | E/Cost (M) | Bid Security + Stamp duty (PKR) | Cost of tender form @0.03% (PKR) | Time Limit |
|---|---|---|---|---|---|
| 1 | ADP (1904502) Constn/Imp. of flood protection works, Channels and Solar Tube Wells in Haripur and Khanpur Tehsil of District Haripur; Installation of Solar System for existing Irrigation Tube Well at Kamalpur District Haripur | 1.940 | 42800 | 582 | 24 Months |
| 2 | Construction of Flood Protection work in soka nullah village Shorga & Karwala District Haripur | 1.560 | 35200 | 470 | 24 Months |
| 3 | Construction of FPWorks in soka nullah village Dureshkhel, Phulla Gali & Bandi Sher Khan | 3.499 | 73980 | 1050 | 24 Months |
| 4 | Construction of Flood Protection work in soka nullah village Gandan & Ghuman | 1.505 | 34100 | 452 | 24 Months |
| 5 | Construction of Flood Protection work in soka nullah village Burakote & Korai District Haripur | 3.375 | 71500 | 1013 | 24 Months |
| 6 | Construction of Flood Protection work in soka nullah village Lailan & Neelan Bhoto | 1.627 | 36540 | 488 | 24 Months |
| 7 | Construction of Flood Protection Works in Kotal Kacha village Tugar Dhoke & Ousla Maria | 3.110 | 66200 | 933 | 24 Months |
| 8 | Construction of Flood Protection Works in Kahal Soka Kot Najibullah District Haripur | 2.590 | 51800 | 1557 | 24 Months |
| 9 | Construction of Flood Protection work in Neelan Nullah village Karwali & Nartopa | 1.770 | 39400 | 531 | 24 Months |
| 10 | Construction of Flood Protection works in Local Nullah village Naplofar District Haripur | 2.070 | 45400 | 621 | 24 Months |
| 11 | Construction of Flood Protection works in Local Nullah village Babru & Darrain | 3.110 | 66200 | 933 | 24 Months |
| 12 | Construction of Flood Protection works in Kahal Soka at village Sirya & Khud in Punjl | 5.000 | 109000 | 1500 | 24 Months |
| 13 | Construction of Flood Protection works in Local Nullah Village Chajjah & Saral District Haripur | 3.140 | 66800 | 942 | 24 Months |
| 14 | Construction of Flood Protection works in Local Nullah at village Shirbang District Haripur | 1.850 | 41000 | 555 | 24 Months |
| 15 | Construction of Flood Protection Work in soka nullah village Sarai Selat Maira & Sarai Saleh | 4.600 | 96000 | 1380 | 24 Months |
| 16 | Construction of Flood Protection Work in soka nullah village Rehana, Chatti & Koka | 3.340 | 70800 | 1000 | 24 Months |
| 17 | Construction of Flood Protection Work in soka nullah village Darvesh, Moh:Khajoop, Kamal Moira & Peeran District Haripur | 3.500 | 109000 | 1500 | 24 Months |
| 18 | Construction of Flood Protection Work in soka nullah village Banda Muneer Khan, Baylan Ahmed Ali Khan & Bandi Mian Peerabad District Haripur | 3.620 | 76400 | 1086 | 24 Months |
| 19 | Construction of Flood Protection Work in soka nullah village Paswal, Singhri, Karach & Noor pur | 3.990 | 83800 | 1200 | 24 Months |
| 20 | Construction of Flood Protection Work in soka nullah village Kachi & Chanjola | 2.980 | 63600 | 900 | 24 Months |
| 21 | Construction of Flood Protection Work in soka nullah village Dapra & Roz Khoraar | 2.710 | 58200 | 813 | 24 Months |
| 22 | Construction of Flood Protection Work in soka nullah village Kakrot District Haripur | 2.320 | 50400 | 696 | 24 Months |
| 23 | Construction of Flood Protection Work in soka nullah village Harchal, Mari & Gandaf | 3.500 | 74000 | 1050 | 24 Months |
| 24 | Construction of Flood Protection Work in soka nullah village Sabah Wara & Kalingran | 4.500 | 94000 | 1350 | 24 Months |
| 25 | Construction of Flood Protection Work in soka nullah village Kehyin & Ladramang | 2.950 | 64000 | 900 | 24 Months |
Important Dates: Last date for submission of bids is 26/08/2026 at 12:30 PM. Bids will be opened on the same day at 12:30 PM in the presence of the bidders or their representatives who choose to attend.
Bid Security & Submission Details (terms):
- Bid security in the shape of Call Deposit (original) as per Khyber Pakhtunkhwa Revenue Authority should be submitted.
- Bids submitted without the required original documents / original call deposit will be declared non-responsive.
- Bid security shall be 2% of the estimated cost and shall be accepted in envelope of the estimated cost in the shape of Call Deposit (Original) as per Khyber Pakhtunkhwa rules.
- Only bidders registered on EPADS / Bidders system on BQ / Engineer's estimate based on the MRS 2022 and Annual / NSI where applicable are eligible.
- Contractors / Firms must be registered with the Khyber Pakhtunkhwa Revenue Authority as required where applicable.
Additional Notes: The procuring agency reserves the right to accept or reject any or all bids as per rules. Electronic bidding shall be through EPADS; original call deposit to be submitted as per tender documents. For detailed terms, eligibility criteria, and full scope refer to the bid solicitation documents available on the Irrigation Department website and KPPRA website.
Contact / Authority: Executive Engineer, Haripur Irrigation Division Haripur.
Reference: INF(P)3887/26