Tender: 25 Flood-Protection Works & Solar Tube-Well Installation — Irrigation Division Haripur (E-Bidding)

Haripur · Daily Mashriq,

Tender advertisement published in Daily Mashriq on Sunday, 2 August 2026, listed under Haripur. The last date printed on the advertisement was Monday, 17 August 2026 and has passed.

Similar tenders

All tenders
Newspaper clipping: Tender: 25 Flood-Protection Works & Solar Tube-Well Installation — Irrigation Division Haripur (E-Bidding), Daily Mashriq, 02 Aug 2026 Open the full-size clipping
Original clipping · Daily Mashriq · 02 Aug 2026 · tap to zoom

Advertisement details

Issuer: Executive Engineer Haripur Irrigation Division, Haripur (Government of Khyber Pakhtunkhwa)

Notice: Invitation for E-Bidding (EPADS) — Single Stage Single Envelope Procedure (2nd Time) for 25 separate works (mainly flood protection works at multiple nullahs / villages of District Haripur and installation of a solar system for an existing irrigation tube well at Kamalpur).

Submission / Opening: Electronic bids through EPADS. Original call deposit (bid security) in approved form must be submitted in support of the online bid as required in the tender documents.

How to obtain documents: Bid solicitation documents including instructions to bidders can be downloaded from Irrigation website and KPPRA website.

Sr Work Name E/Cost (M) Bid Security + Stamp duty (PKR) Cost of tender form @0.03% (PKR) Time Limit
1 ADP (1904502) Constn/Imp. of flood protection works, Channels and Solar Tube Wells in Haripur and Khanpur Tehsil of District Haripur; Installation of Solar System for existing Irrigation Tube Well at Kamalpur District Haripur 1.940 42800 582 24 Months
2 Construction of Flood Protection work in soka nullah village Shorga & Karwala District Haripur 1.560 35200 470 24 Months
3 Construction of FPWorks in soka nullah village Dureshkhel, Phulla Gali & Bandi Sher Khan 3.499 73980 1050 24 Months
4 Construction of Flood Protection work in soka nullah village Gandan & Ghuman 1.505 34100 452 24 Months
5 Construction of Flood Protection work in soka nullah village Burakote & Korai District Haripur 3.375 71500 1013 24 Months
6 Construction of Flood Protection work in soka nullah village Lailan & Neelan Bhoto 1.627 36540 488 24 Months
7 Construction of Flood Protection Works in Kotal Kacha village Tugar Dhoke & Ousla Maria 3.110 66200 933 24 Months
8 Construction of Flood Protection Works in Kahal Soka Kot Najibullah District Haripur 2.590 51800 1557 24 Months
9 Construction of Flood Protection work in Neelan Nullah village Karwali & Nartopa 1.770 39400 531 24 Months
10 Construction of Flood Protection works in Local Nullah village Naplofar District Haripur 2.070 45400 621 24 Months
11 Construction of Flood Protection works in Local Nullah village Babru & Darrain 3.110 66200 933 24 Months
12 Construction of Flood Protection works in Kahal Soka at village Sirya & Khud in Punjl 5.000 109000 1500 24 Months
13 Construction of Flood Protection works in Local Nullah Village Chajjah & Saral District Haripur 3.140 66800 942 24 Months
14 Construction of Flood Protection works in Local Nullah at village Shirbang District Haripur 1.850 41000 555 24 Months
15 Construction of Flood Protection Work in soka nullah village Sarai Selat Maira & Sarai Saleh 4.600 96000 1380 24 Months
16 Construction of Flood Protection Work in soka nullah village Rehana, Chatti & Koka 3.340 70800 1000 24 Months
17 Construction of Flood Protection Work in soka nullah village Darvesh, Moh:Khajoop, Kamal Moira & Peeran District Haripur 3.500 109000 1500 24 Months
18 Construction of Flood Protection Work in soka nullah village Banda Muneer Khan, Baylan Ahmed Ali Khan & Bandi Mian Peerabad District Haripur 3.620 76400 1086 24 Months
19 Construction of Flood Protection Work in soka nullah village Paswal, Singhri, Karach & Noor pur 3.990 83800 1200 24 Months
20 Construction of Flood Protection Work in soka nullah village Kachi & Chanjola 2.980 63600 900 24 Months
21 Construction of Flood Protection Work in soka nullah village Dapra & Roz Khoraar 2.710 58200 813 24 Months
22 Construction of Flood Protection Work in soka nullah village Kakrot District Haripur 2.320 50400 696 24 Months
23 Construction of Flood Protection Work in soka nullah village Harchal, Mari & Gandaf 3.500 74000 1050 24 Months
24 Construction of Flood Protection Work in soka nullah village Sabah Wara & Kalingran 4.500 94000 1350 24 Months
25 Construction of Flood Protection Work in soka nullah village Kehyin & Ladramang 2.950 64000 900 24 Months

Important Dates: Last date for submission of bids is 26/08/2026 at 12:30 PM. Bids will be opened on the same day at 12:30 PM in the presence of the bidders or their representatives who choose to attend.

Bid Security & Submission Details (terms):

  • Bid security in the shape of Call Deposit (original) as per Khyber Pakhtunkhwa Revenue Authority should be submitted.
  • Bids submitted without the required original documents / original call deposit will be declared non-responsive.
  • Bid security shall be 2% of the estimated cost and shall be accepted in envelope of the estimated cost in the shape of Call Deposit (Original) as per Khyber Pakhtunkhwa rules.
  • Only bidders registered on EPADS / Bidders system on BQ / Engineer's estimate based on the MRS 2022 and Annual / NSI where applicable are eligible.
  • Contractors / Firms must be registered with the Khyber Pakhtunkhwa Revenue Authority as required where applicable.

Additional Notes: The procuring agency reserves the right to accept or reject any or all bids as per rules. Electronic bidding shall be through EPADS; original call deposit to be submitted as per tender documents. For detailed terms, eligibility criteria, and full scope refer to the bid solicitation documents available on the Irrigation Department website and KPPRA website.

Contact / Authority: Executive Engineer, Haripur Irrigation Division Haripur.

Reference: INF(P)3887/26