PESCO Early Market Engagement for Supply & Commissioning of Aerial Bundle Cable – EDEIP (Project P170230)
PESCO Early Market Engagement for Supply & Commissioning of Aerial Bundle Cable – EDEIP (Project P170230) · Peshawar and Khyber · Daily Mashriq,
Tender advertisement published in Daily Mashriq on Saturday, 25 July 2026, listed under Peshawar and Khyber. Issued by PESCO Early Market Engagement for Supply & Commissioning of Aerial Bundle Cable – EDEIP (Project P170230). The last date printed on the advertisement was Wednesday, 29 July 2026 and has passed.
The original image is temporarily unavailable. Use the source link or the details below. Open the full-size clipping Advertisement details
Issuer: Peshawar Electric Supply Company (PESCO) – Chief Engineer (Development), Project Management Unit (PMU). Project: World Bank Electricity Distribution Efficiency Improvement Project (EDEIP) Project ID: P170230.
Purpose: Early Market Engagement (EME) to solicit feedback from national and international firms/suppliers/bidders on the supply, installation, testing and commissioning of Aerial Bundle Cable (ABC) and associated materials for PESCO Peshawar and Khyber Operation Circles prior to formal procurement. The exercise intends to inform the forthcoming procurement approach and contract packaging.
Interested parties are invited to join an in-person or online EME session to review the preliminary material list, provide technical and commercial feedback, and comment on procurement packaging, specifications, contract conditions and market capacity.
EME session details:
Date & Time: 2026-07-29 at 11:00 hours
Venue: Office of the Chief Engineer (Development), PMU, PESCO (Peshawar). Online participation: Microsoft Teams.
Online Meeting: Meeting ID: 934 089 719 856; Passcode: gK3vv2. Participants are requested to ensure availability and join the session in a timely manner.
Key contact and submission:
Project Management Unit, Chief Engineer (Development), Peshawar Electric Supply Company. Email: [email protected]. Tel: +92-91-9211757. Further details and advertisement available at www.ppra.org.pk and www.pesco.com.pk.
Summary of principal material requirements (selection of items listed in the notice):
| Sr. | Description | Quantity | Unit |
|---|---|---|---|
| 1 | 3x120 mm2 + 1x120 mm2 AA alloy XLPE ABC Cable (4-core) | 101,037 | m |
| 2 | 3x95 mm2 + 1x95 mm2 AA alloy XLPE ABC Cable (4-core) | 792,229 | m |
| 3 | 3x50 mm2 + 1x50 mm2 AA alloy XLPE ABC Cable (4-core) | 440,496 | m |
| 4 | 3x25 mm2 + 1x25 mm2 AA alloy XLPE ABC Cable (4-core) | 29,170 | m |
| 5 | 3x16 mm2 + 1x16 mm2 AA alloy XLPE ABC Cable (4-core) | 1,267,100 | m |
| 6 | Insulated piercing connector (T-off for T/F circuit >2) for 50–120 mm2 | 207,053 | No |
| 7 | Insulated piercing connector (single-phase / three-phase) | 405,088 | No |
| 8 | Suspension clamps with bracket | 24,915 | No |
| 9 | Self-adjusted tension end / dead-end clip (50–120 mm2) | 44,015 | No |
| 10 | Protection end cap 120 mm2 | 8,735 | No |
| 11 | Protection end cap 95 mm2 | 3,865 | No |
| 12 | Protection end cap 50 mm2 | 15,036 | No |
| 13 | Eye nut | 4,004 | No |
| 14 | Insulated bimetallic compression lugs 120 mm2 ABC for transformer LT connection | 9,912 | No |
| 15 | Insulated bimetallic compression lugs 95 mm2 ABC for transformer LT connection | 15,480 | No |
| 16 | Insulated bimetallic compression lugs 50 mm2 ABC for transformer LT connection | 11,268 | No |
| 17 | Plastic tip (packets) | 1,064 | Pkt |
| 18 | Bolt 1/2" x 5/8" | 15,861 | No |
| 19 | Bolt 1/2" x 5/8" (additional) | 56,361 | No |
| 20 | Square washer 5/8" | 56,361 | No |
| 21 | Steel X-arm with braces | 2,700 | No |
| 22 | Pin insulator | 8,100 | No |
| 23 | Steel pins for steel X-arm | 8,100 | No |
| 24 | LT PC poles | 4,781 | No |
| 25 | LT structure | 3,508 | No |
| 26 | HT steel structure 45' | 114 | No |
| 27 | HT steel structure 58' | 9 | No |
| 28 | HT steel structure 34'-8" | 2,577 | No |
| 29 | Earthing unit | 1,989 | No |
| 30 | GSL | 8,791 | No |
| 31 | Meter frame | 6,410 | No |
| 32 | Shifting of single-phase meter | 196,710 | No |
| 33 | Shifting of three-phase meter | 2,917 | No |
| 34 | Foundation of HT/LT steel structures | 2,602 | No |
Notes to participants (as provided): Parties are requested to provide feedback on:
- Indicative timeline for supply and implementation of aerial bundle cable (ABC) in Peshawar & Khyber Operation Circles.
- Common or prevalent risks within the supply chain.
- Market/technical and financial capacity and capabilities.
- Feedback on proposed specifications or risk allocation, if any.
- Suggestions on packaging, contract approach, and any innovations or technologies in the market that may enhance performance or reduce costs.
All interested national and international suppliers, manufacturers, contractors and service providers are encouraged to participate. The session is intended to promote competitive procurement and gather market inputs ahead of the formal tendering process.
Published in Daily Mashriq on Saturday, 25 July 2026. DailyAds.pk indexes newspaper advertisements; the original notice and the issuing organisation remain the source for final terms and eligibility.