Tender: Playground Construction (ADP No. 180553) — C&W Building Division Haripur
Tender advertisement published in Daily Mashriq on Sunday, 5 July 2026, listed under Haripur. The last date printed on the advertisement was Tuesday, 21 July 2026 and has passed.
Similar tenders
All tendersMore tenders
Advertisement details
Issuer: Government of Khyber Pakhtunkhwa, C&W Building Division Haripur.
Notice: Notice inviting tender on E-PAD System (Single Stage Single Envelope E-PAD System) for construction work under ADP No. 180553.
| Name of work / Details | ADP No. 180553 Development of 1000-Playing facilities in Khyber Pakhtunkhwa SH: Construction of playground at Main Chowk KTS District Haripur (Risk & Cost of original contractor). |
|---|---|
| Required category of PEC | C-6 |
| Estimated Cost (E/Cost) | 6.694 |
| 2% Bid Security | 133880 |
| Tender Fee | 0.03% of E/Cost (value shown: 2009) |
| Period of completion | As per work order |
| Last date & time of submission of bid | 21.07.2026 12:00 PM (E-PAD) |
| Date of opening & time | 21.07.2026 (time as per notice / E-PAD) |
| Contact | Executive Engineer, C&W Building Division Haripur. Ph & Fax: +92-995-920041 |
Instructions to bidders (summary of printed points):
- Bids to be submitted through the Online E-PAD System (Single Stage Single Envelope E-PAD System).
- Contractors quoting up to a limit of 10% below Engineer's estimate shall submit bid security @ 2% of Engineer's Estimate.
- Contractors quoting more than 10% below up to 20% below must submit along with their bids 8% Additional Security of Engineer's Estimate in addition to 2% bid security.
- If the bid is not accompanied with the required amount of additional security it will be considered non-responsive and the 2% bid security shall be forfeited in favour of Government and the second lowest bidder and so on shall be considered accordingly.
- Contractors quoting more than 20% below shall submit with their bid an additional security on Engineer's Estimated cost equal to the differential amount of submitted bid and Engineer's Estimate along with detailed rate analysis. In case of more than 20% below bids, if the bid is not accompanied by the detailed rate analysis and/or required amount of additional security, then the bid shall be considered as non-responsive.
- All securities submitted along with such non-responsive bid shall be forfeited in favour of Government and the 2% lowest bidder and so on will be considered accordingly.
- In case detailed rate analysis submitted with the bids is, in view of the Procuring Entity, not convincing, the Head of the Procuring Entity may declare such bid as non-responsive without any forfeiture of bid securities and record reasons thereof.
- The procuring entity may offer the contract to next lowest bidder after due diligence in the context of financial difference between such two bids or may advertise procurement opportunity afresh.
- The procuring entity may replace the Additional Security with a bank guarantee of the same amount from the scheduled bank; if the already deposited security is not in the form of bank guarantee.
- The Additional Security shall be released to the contractor in four installments: 1st installment of 25% to be released upon completion of 25% of the project, 2nd installment of 25% to be released upon completion of 50% of the project, 3rd installment of 25% to be released upon completion of 75% of the project and the 4th installment of 25% to be released after 100% completion of the project.
- All bidding will be conducted through the E-PAD System. The financial bid should be submitted by their own self or his authorized representative before the specified closing date and time. No CDRs will be considered after the deadline.
- All the bidders must be submit their valid enlistment of C&W Department / PEC updated at the time of submission of CDR.
- All the bidders may be deposited tender form fee Rs. 0.03% on E/Cost by each participating contractor online along-with earnest money.
- Electronic bidding shall be done on 'Above / Below' system on BOQ / Engineer's estimate, based on the MRS applicable. Only two digits after the decimal point shall be considered for evaluation purpose.
- Any bidder who provides incorrect information shall stand disqualified and will be debarred.
- Electronic bid will be displayed by Online E-PAD System after 30 minutes of closing time in the presence of bidders or their representatives who choose to be present.
- The employer has the authority to reject any bid or all the bids assigning valid reason.
- Bid security of all bidders will be retained by the employer till finalization of bid.
- All bidders are required to be registered with Khyber Pakhtunkhwa Revenue Authority establishment under the Khyber Pakhtunkhwa Finance Act, 2013 (other-wise he will not be entitled to participate in tendering process).
- As per KPPRA Notification No. SRO(29)/Vol-I/40-2025-26/699-712 dated 29.10.2025 in case of failure to submit the original bid security & additional security in time the procuring entity debar the tenderer for a period of one (01) year. In case the violation of second time, blacklist him for a minimum period of three (03) years in accordance with Section 29 of the KPPRA Act read with Rule 44 of the Khyber Pakhtunkhwa Public Procurement of Goods, Works & Services Rules, 2014.
- Electronic bid will be valid for Ninety (90) days.
All other instructions and detailed bid submission requirements and conditions are available in the full tender document on the E-PAD portal.
Reference / INF: INF (P) 3333/26
Executive Engineer
C&W Building Division Haripur
Ph & Fax # +92-995-920041
Published in Daily Mashriq on Sunday, 5 July 2026. DailyAds.pk indexes newspaper advertisements; the original notice and the issuing organisation remain the source for final terms and eligibility.