DailyAds.pk
Saved

Corrigendum: Tender IPL-9295 — Digital Bank Guarantee / 1link Payment Requirement (LG&CD Civil Division Gujrat)

Corrigendum · Gujrat · Jang,

Tender advertisement published in Jang on Sunday, 6 September 2026, listed under Gujrat. Issued by Corrigendum.

Newspaper clipping: Corrigendum: Tender IPL-9295 — Digital Bank Guarantee / 1link Payment Requirement (LG&CD Civil Division Gujrat), Jang, 06 Sep 2026 Open the full-size clipping
Original clipping · Jang · 06 Sep 2026 · tap to zoom

Advertisement details

Executive Engineer, LG&CD Civil Division Gujrat issues a corrigendum to a previously published tender notice clarifying bid security and payment transmission requirements.

IssuerExecutive Engineer, LG&CD Civil Division Gujrat
Tender reference / IPLIPL-9295
PPRA Unique Code254906T280820264518
NewspaperExpress Tribune
Sr. No.8875
Publication date shown28-08-2026

Key corrigendum points:

- Bid Security: Bidders must submit bid security equal to 5% of the estimated cost only through a Digital Bank Guarantee (e-Bank Guarantee) or via the 1link payment method on the Punjab e-Procurement System.

- PSID and Transmission: The bidder shall generate the PSID from the e-Procurement Portal and arrange for its scheduled bank to issue and transmit the Digital Bank Guarantee through SWIFT MT760 or the 1link payment method in favour of the Executive Engineer, LG&CD Civil Division Gujrat.

- Physical bid securities (CDR, Pay Order, Demand Draft, etc.) will not be accepted. Bids submitted without a valid Digital Bank Guarantee or online payment will be rejected.

- The issuing bank must transmit the Bank Guarantee through SWIFT MT760 or the 1link payment to the designated advising bank with the correct Tender Reference Number and PSID.

Other terms and conditions remain the same as published in the original newspapers and on the PPRA website for the LG&CD Department, Civil Division Gujrat.

Published in Jang on Sunday, 6 September 2026. DailyAds.pk indexes newspaper advertisements; the original notice and the issuing organisation remain the source for final terms and eligibility.

Jang · 06 Sep 2026
Fit