DailyAds.pk
Saved
Tenders Closed 28 Aug 2026

GEPCO Tender Notice – 132 kV Transmission Line Works (Gujranwala)

GEPCO Tender Notice – 132 kV Transmission Line Works (Gujranwala) · Gujranwala · Jang,

Tender advertisement published in Jang on Thursday, 6 August 2026, listed under Gujranwala, Pakistan. Issued by GEPCO Tender Notice – 132 kV Transmission Line Works (Gujranwala). The last date printed on the advertisement was Friday, 28 August 2026 and has passed.

Newspaper clipping: GEPCO Tender Notice – 132 kV Transmission Line Works (Gujranwala), Jang, 06 Aug 2026 Open the full-size clipping
Original clipping · Jang · 06 Aug 2026 · tap to zoom

Advertisement details

Gujranwala Electric Power Company (GEPCO) invites sealed tenders for construction, shifting and foundation works for 132 kV double-circuit transmission lines and associated tower foundations. Bidders must be registered with PEC and comply with PPRA procedures. Tender documents are available via E-Pads (new version 2.0) and GEPCO website. Submission and opening will take place on the dates below at the Project Director (GSC), GEPCO Gujranwala office.

Sr. Tender No. Scope of Work (summary) BOQ Cost (Rs.) Completion Period PEC Registration Required
1 04/2026-27 132 kV D/C T-Line Narowal – HUBCO/Narang: construction of tower foundations (EA+0+8 meter raised tower foundations & EG+0+6 meter raised tower foundations), shifting of material from GEPCO Ware House Wazirabad to site, erection of towers, welding of nuts & bolts, stringing of 6/0.402 km rail conductor, work on existing Lynx conductor and earth wire. 8,413,045.00 60 Days CE-10, CE-02 & EE-05
2 05/2026-27 132 kV D/C T-Line IN & OUT feed for Royal Palm City Grid Station from 132 kV Chiniwala–Eminabad T-Line: construction of tower/pile foundations (Type ZM-30, SPG etc.), shifting of material from GEPCO Ware House Wazirabad, erection of towers, welding of nut & bolts, stringing of conductor and earth wire. 9,921,604.00 60 Days CE-10, CE-02 & EE-05

Key dates and submission:

Bid submission date & time: 2026-08-28 at 11:00 Hrs.  |  Bid opening date & time: 2026-08-28 at 11:30 Hrs.

Eligibility & key conditions:

  • Valid PEC registration renewal for year 2025-26 under the codes stated in the table.
  • Minimum average annual turnover with Tax return from FBR as per tender BOQ for last 2 years (as verified by certified auditor).
  • Current bank statement & proof of experience: contractor must submit experience certificates showing at least 02 no. valid work orders or cumulative cost equal to or more than 100% of BOQ amount or work completion certificates issued from work order issuing authority for executing work during last 05 years.
  • Original bid security (earnest money) valid for 120 days in the form of Bank Draft/Pay Order/CDR/Bank Guarantee from a scheduled bank in Pakistan equal to 2% of BOQ cost.
  • Successful bidder to submit performance security equal to 10% of Contract Price in the form of Bank Draft/Pay Order/CDR/Bank Guarantee after issuance of LOI.
  • Contractors must attach active registration certificates (PRA for PST) with the bid and submit company profile and evidence of transmission line work for last five years.
  • Authority letter on PKR 1,000 judicial stamp paper required for contractor representatives to receive tender documents/participate.
  • Tender offers must be in figures and words, signed as per instructions; cutting/overwriting not allowed.
  • Tendering procedure: Single Stage Two Envelope as per PPRA rules and tender will be opened through E-Pads (version 2.0).

Contact & submission address:

Project Director (GSC), GEPCO Gujranwala
132 kV Grid Station, Hafizabad Road, Gujranwala (near Awan Chowk).
Phone: 055-3412141   Fax: 055-3412170

Note: The Department/Company reserves the right to accept or reject any or all tenders as per PPRA Rules. Prospective bidders should consult the tender documents for full terms, conditions and detailed scope.

Published in Jang on Thursday, 6 August 2026. DailyAds.pk indexes newspaper advertisements; the original notice and the issuing organisation remain the source for final terms and eligibility.

Jang · 06 Aug 2026
Fit